Document | Date |
Affordable housing statement - HOUSING & VIABILITY STATEMENT | 22/05/2018 |
Affordable housing statement - QUOD CLARIFICATION NOTE (NOV 18) | 13/09/2019 |
Affordable housing statement - HOUSING & VIABILITY STATEMENT - EXECUTIVE SUMMARY | 22/05/2018 |
Affordable housing statement - QUOD CONSOLIDATED NOTES (MAY TO NOVEMBER 2018) | 13/09/2019 |
Affordable housing statement - QUOD CLARIFICATION NOTE 2 (NOV 18) | 13/09/2019 |
Affordable housing statement - QUOD CLARIFICATION NOTE 3 (NOV 18) | 13/09/2019 |
Affordable housing statement - QUOD RESPONSE TO BNPP REPORT (FEB 19) | 13/09/2019 |
Affordable housing statement - HOUSING & VIABILITY STATEMENT ADDENDUM - EXECUTIVE SUMMARY | 26/06/2019 |
Affordable housing statement - HOUSING & VIABILITY STATEMENT ADDENDUM | 26/06/2019 |
Amended plan - MASTERPLAN - PARAMETER PLANS | 15/03/2019 |
Amended plan - MASTERPLAN - PARAMETER PLANS | 31/10/2018 |
Amended plan - PHASE 1 - PLOT A1: PLANS, ELEVATIONS, SECTIONS & AREAS (1 OF 3) | 08/03/2019 |
Amended plan - PHASE 1 - PLOT A1: PLANS, ELEVATIONS, SECTIONS & AREAS (2 OF 3) | 08/03/2019 |
Amended plan - PHASE 1 - PLOT A1: PLANS, ELEVATIONS, SECTIONS & AREAS (3 OF 3) | 08/03/2019 |
Amended plan - PHASE 1 - PLOT A2: PLANS, ELEVATIONS, SECTIONS & AREAS | 08/03/2019 |
Amended plan - PHASE 1 - PLOT K1: PLANS, ELEVATIONS, SECTIONS & AREAS | 08/03/2019 |
Amended plan - PHASE 1 - INTERIM PETROL FILLING STATION: DRAWINGS & AREA SCHEDULE | 08/03/2019 |
Application form - UPDATED (FEBRUARY 2019) | 08/03/2019 |
Application form - UPDATED (OCTOBER 2018) | 30/10/2018 |
Application form | 22/05/2018 |
Application: Amending letter | 21/06/2019 |
Application: Amending letter - AMENDED LETTER 061118 | 06/11/2018 |
Application: Amending letter | 30/10/2018 |
Application: Amending letter | 08/03/2019 |
Application: Covering letter | 22/05/2018 |
Construction Method Statement - PHASE 1 - PLOT K1: CONSTRUCTION MANAGEMENT PLAN | 24/05/2018 |
Construction Method Statement - PHASE 1 - PLOT A2: CONSTRUCTION MANAGEMENT PLAN | 24/05/2018 |
Construction Method Statement - PHASE 1 - PLOT A1: CONSTRUCTION MANAGEMENT PLAN | 23/05/2018 |
Construction Method Statement - FRAMEWORK CONSTRUCTION MANAGEMENT PLAN | 22/05/2018 |
Consultation List | 10/01/2019 |
Consultation List | 27/06/2019 |
Consultation List | 15/06/2018 |
Daylight/Sunlight assessment - SUMMARY OF RESULTS | 04/09/2019 |
Daylight/Sunlight assessment - APPENDIX 1: PRINCIPLES OF DAYLIGHT & SUNLIGHT | 12/08/2019 |
Daylight/Sunlight assessment - APPENDIX 4: DAYLIGHT & SUNLIGHT RESULTS | 12/08/2019 |
Daylight/Sunlight assessment - MAIN REPORT (v2)(OCT 18) | 12/08/2019 |
Daylight/Sunlight assessment - ADDITIONAL REPORT FOCUSSING ON ALFRED SALTER SCHOOL AND PLOT K1 | 08/03/2019 |
Daylight/Sunlight assessment - PHASE 1 - PLOT K1: INTERNAL DAYLIGHT AND SUNLIGHT REPORT | 31/10/2018 |
Daylight/Sunlight assessment - MASTERPLAN (PART 4 OF 4) | 31/10/2018 |
Daylight/Sunlight assessment - MASTERPLAN (PART 1 OF 4) | 31/10/2018 |
Daylight/Sunlight assessment - MASTERPLAN (PART 3 OF 4) | 31/10/2018 |
Daylight/Sunlight assessment - MASTERPLAN (PART 2 OF 4) | 31/10/2018 |
Daylight/Sunlight assessment - PHASE 1 - PLOT A1: INTERNAL DAYLIGHT AND SUNLIGHT REPORT (PART 2 OF 2) | 23/05/2018 |
Daylight/Sunlight assessment - PHASE 1 - PLOT A1: INTERNAL DAYLIGHT AND SUNLIGHT REPORT (PART 1 OF 2) | 23/05/2018 |
Daylight/Sunlight assessment - APPENDIX 3: WINDOW MAPS | 12/08/2019 |
Daylight/Sunlight assessment - APPENDIX 2: DAYLIGHT & SUNLIGHT MODEL | 12/08/2019 |
Daylight/Sunlight assessment - APPENDIX 5: FACADE STUDY | 12/08/2019 |
Design and access statement - PHASE 1 - PLOT A1 (PART 7 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 6 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 5 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 4 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 3 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 2 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 1 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT K1: DAS ADDENDUM - CORRECTED PLAYSPACE FIGURES | 06/11/2018 |
Design and access statement - PHASE 1 - INTERIM PETROL FILLING STATION: DAS ADDENDUM | 08/03/2019 |
Design and access statement - PHASE 1 - PLOT K1 | 24/05/2018 |
Design and access statement - PHASE 1 - PLOT A2 (PART 5 OF 5) | 24/05/2018 |
Design and access statement - PHASE 1 - PLOT A2 (PART 4 OF 5) | 24/05/2018 |
Design and access statement - PHASE 1 - PLOT A2 (PART 3 OF 5) | 24/05/2018 |
Design and access statement - PHASE 1 - PLOT A2 (PART 2 OF 5) | 24/05/2018 |
Design and access statement - PHASE 1 - PLOT A2 (PART 1 OF 5) | 24/05/2018 |
Design and access statement - MASTERPLAN PUBLIC REALM (PART 2 OF 2) | 22/05/2018 |
Design and access statement - MASTERPLAN PUBLIC REALM (PART 1 OF 2) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 9 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 8 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 7 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 6 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 5 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 4 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 3 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 2 OF 9) | 22/05/2018 |
Design and access statement - MASTERPLAN (PART 1 OF 9) | 22/05/2018 |
Design and access statement - PHASE 1 - PUBLIC REALM (ZONE A) | 24/05/2018 |
Design and access statement - PHASE 1 - PLOT A2: DAS ADDENDUM | 31/10/2018 |
Design and access statement - PHASE 1 - PLOT A1: DAS ADDENDUM | 31/10/2018 |
Design and access statement - PHASE 1 - INTERIM PETROL FILLING STATION | 31/10/2018 |
Design and access statement - MASTERPLAN - DESIGN GUIDELINES PUBLIC REALM (PART 2 OF 2) | 31/10/2018 |
Design and access statement - MASTERPLAN - DESIGN GUIDELINES PUBLIC REALM (PART 1 OF 2) | 31/10/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 9 OF 9) | 23/05/2018 |
Design and access statement - PHASE 1 - PLOT A1 (PART 8 OF 9) | 23/05/2018 |
Document - PHASE 1 - PLOT A2 - EXISTING SURVEY INFORMATION | 24/05/2018 |
Document - UTILITIES AND SERVICES INFRASTRUCTURE STRATEGY | 23/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES (PART 2 OF 7) | 22/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES (PART 1 OF 7) | 22/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT (PART 3 OF 3) | 22/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT (PART 2 OF 3) | 22/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT (PART 1 OF 3) | 22/05/2018 |
Document - SOCIAL REGENERATION CHARTER | 22/05/2018 |
Document - RETAIL AND LEISURE STATEMENT | 22/05/2018 |
Document - RADIO AND TV INTERFERANCE ASSESSMENT | 22/05/2018 |
Document - ILLUSTRATIVE PHASING PLAN | 22/05/2018 |
Document - DEVELOPMENT SPECIFICATION | 22/05/2018 |
Document - DESIGN GUIDELINES - MASTERPLAN (PART 2 OF 2) | 22/05/2018 |
Document - DESIGN GUIDELINES - MASTERPLAN (PART 1 OF 2) | 22/05/2018 |
Document - FIRE STRATEGY DOCUMENT | 04/09/2019 |
Document - HEALTH IMPACT ASSESSMENT | 22/05/2018 |
Document - EQUALITIES STATEMENT | 22/05/2018 |
Document - CULTURAL STRATEGY | 22/05/2018 |
Document - AVIATION SAFEGUARDING ASSESSMENT | 22/05/2018 |
Document - ENVIRONMENTAL STATEMENT - STATEMENT OF CONFORMITY PART 1 | 08/03/2019 |
Document - DOCUMENT LIST FEBRUARY 2019 | 08/03/2019 |
Document - ENVIRONMENTAL STATEMENT - STATEMENT OF CONFORMITY PART 3 | 08/03/2019 |
Document - ENVIRONMENTAL STATEMENT - STATEMENT OF CONFORMITY PART 2 | 08/03/2019 |
Document - PLOT K1 - VISUALISATIONS FROM ALFRED SALTER SCHOOL | 24/01/2019 |
Document - MASTERPLAN - DEVELOPMENT SPECIFICATION | 08/03/2019 |
Document - MASTERPLAN - DEVELOPMENT SPECIFICATION | 21/06/2019 |
Document - MASTERPLAN - DESIGN GUIDELINES PART 2 | 21/06/2019 |
Document - MASTERPLAN - DESIGN GUIDELINES PART 1 | 21/06/2019 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES (PART 7 OF 7) | 22/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES (PART 6 OF 7) | 22/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES (PART 5 OF 7) | 22/05/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES (PART 4 OF 7) | 22/05/2018 |
Document - BRITISH LAND RESPONSE TO ROTHERHITHE AREA HOUSING FORUM | 11/04/2019 |
Document - Design Council CABE and Design Review Panel workshop note October 2017 (plots A1 and A2) | 25/10/2017 |
Document - Design Council CABE and Design Review Panel workshop note October 2017 (masterplan) | 25/10/2017 |
Document - MASTERPLAN - OPEN SPACE STRATEGY | 31/10/2018 |
Document - MASTERPLAN - DEVELOPMENT SPECIFICATION | 31/10/2018 |
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES (PART 3 OF 7) | 22/05/2018 |
Energy statement - ENERGY STRATEGY | 22/05/2018 |
Energy statement - PHASE 1 - PLOT A2 | 24/05/2018 |
Environmental Statement - ADDENDUM - VOLUME I - MAIN CHAPTERS - CHAPTER 7: SOCIO-ECONOMICS ERRATA NOTE | 17/12/2018 |
Environmental Statement - LUC REVIEW OF ENVIRONMENTAL STATEMENT - ADDENDUM REVIEW (AUGUST 19) | 13/09/2019 |
Environmental Statement - LUC REVIEW OF ENVIRONMENTAL STATEMENT - COMMENTARY ON WATERMAN RESPONSE (MAY 2019) | 13/09/2019 |
Environmental Statement - LUC REVIEW (FRR) OF ENVIRONMENTAL STATEMENT (NOV 18) | 13/09/2019 |
Environmental Statement - ADDENDUM NON TECHNICAL SUMMARY | 21/06/2019 |
Environmental Statement - ADDENDUM VOLUME II - FIGURES | 21/06/2019 |
Environmental Statement - ADDENDUM VOLUME 1 - MAIN CHAPTERS | 21/06/2019 |
Environmental Statement - ADDENDUM VOLUME III - TECHNICAL APPENDICES | 21/06/2019 |
Environmental Statement - NON-TECHNICAL SUMMARY (UPDATED OCTOBER 2018) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 18 TBHVIA (PART 6 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 18 TBHVIA (PART 5 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 18 TBHVIA (PART 4 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 18 TBHVIA (PART 3 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 18 TBHVIA (PART 2 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 18 TBHVIA (PART 1 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 17 (PART 2 OF 3) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 17 (PART 1 OF 3) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 15-16 (PART 6 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 17 (PART 3 OF 3) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 15-16 (PART 3 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 15-16 (PART 2 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 15-16 (PART 1 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDIX 14 | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 11 - 13 | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 15-16 (PART 5 OF 6) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 9 - 10 | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 1 - 8 | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME II: FIGURES (PART 2 OF 2) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME II: FIGURES (PART 1 OF 2) | 31/10/2018 |
Environmental Statement - ADDENDUM - VOLUME I: MAIN CHAPTERS | 30/10/2018 |
Environmental Statement - ADDENDUM - VOLUME III: TECHNICAL APPENDICES 15-16 (PART 4 OF 6) | 31/10/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 17.1 - CUMULATIVE ASSESSMENT | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 16.1 - DAYLIGHT, SUNLIGHT & OVERSHADOWING | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 15.1 - WIND ASSESSMENT | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 14.1 - ARCHAEOLOGY | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 13.1 - ECOLOGY | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 12.1 - FLOOD RISK (PART 3 OF 3) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 12.1 - FLOOD RISK (PART 2 OF 3) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 12.1 - FLOOD RISK (PART 1 OF 3) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.2 - REMEDIATION STRATEGY | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 7 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 6 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 5 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 8 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 4 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 3 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 2 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 11.1 - ENVIRONMENTAL RISK (PART 1 OF 8) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 09.1 & 10.1 - NOISE, VIBRATION & AIR QUALITY | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 08.1(C) & (D) - PLOT A2 & K1 TRANSPORT STATEMENT | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 08.1(B) - PLOT A1 TRANSPORT STATEMENT | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 08.1(A) - TRANSPORT ASSESSMENT (PART 2 OF 2) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 08.1(A) - TRANSPORT ASSESSMENT (PART 1 OF 2) | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - 02.1 - EIA SCOPING | 23/05/2018 |
Environmental Statement - VOLUME IV - TECHNICAL APPENDICES - CONTENTS | 23/05/2018 |
Environmental Statement - VOLUME III - TOWNSCAPE AND VISUAL ASSESSMENT (PART 2 OF 2) | 23/05/2018 |
Environmental Statement - VOLUME III - TOWNSCAPE AND VISUAL ASSESSMENT (PART 1 OF 2) | 23/05/2018 |
Environmental Statement - VOLUME II - FIGURES (PART 4 OF 4) | 23/05/2018 |
Environmental Statement - VOLUME II - FIGURES (PART 3 OF 4) | 23/05/2018 |
Environmental Statement - VOLUME II - FIGURES (PART 2 OF 4) | 23/05/2018 |
Environmental Statement - VOLUME II - FIGURES (PART 1 OF 4) | 23/05/2018 |
Environmental Statement - VOLUME I - MAIN CHAPTERS | 23/05/2018 |
Environmental Statement - ERRATA NOTE TO OCTOBER 2018 ADDENDUM - SOCIO-ECONOMIC CHAPTER | 14/02/2019 |
Neighbour consultation replies | 01/10/2019 |
Neighbour consultation replies - ADDITIONAL NEIGHBOUR RESPONSES | 30/09/2019 |
Neighbour consultation replies - TESCO RESPONSE | 17/09/2019 |
Neighbour consultation replies - CANARY WHARF GROUP | 20/09/2019 |
Neighbour consultation replies - TESCO RESPONSE 2 | 20/09/2019 |
Neighbour consultation replies - PHOTOGRAPHS TO HIGHLIGHT MASSING & OVERSHADOWING OBJECTION TO PLOT K1 | 11/09/2019 |
Neighbour consultation replies | 10/05/2019 |
Neighbour consultation replies | 10/05/2019 |
Neighbour consultation replies - CANARY WHARF GROUP | 29/11/2018 |
Neighbour consultation replies - LIST 11 | 15/04/2019 |
Neighbour consultation replies - N233 | 10/12/2018 |
Neighbour consultation replies - ALFRED SALTER PRIMARY SCHOOL 2 | 31/08/2018 |
Neighbour consultation replies - N182 | 13/08/2018 |
Neighbour consultation replies - N177 | 06/08/2018 |
Neighbour consultation replies - SOUTHWARK GREEN PARTY | 14/03/2019 |
Neighbour consultation replies - N175 | 06/08/2018 |
Neighbour consultation replies | 25/07/2018 |
Neighbour consultation replies - LIST 211 | 02/03/2019 |
Neighbour consultation replies - LIST 210 | 08/02/2019 |
Neighbour consultation replies - SOUTHWARK FRIENDS OF THE EARTH | 31/01/2019 |
Neighbour consultation replies - FRIENDS OF STAVE HILL & FRIENDS OF RUSSIA DOCK WOODLAND (OVERSHADOWING PHOTOS) | 23/01/2019 |
Neighbour consultation replies - FRIENDS OF STAVE HILL & FRIENDS OF RUSSIA DOCK WOODLAND | 23/01/2019 |
Neighbour consultation replies | 14/12/2018 |
Neighbour consultation replies - PROJECT LIGHT 3 | 23/11/2018 |
Neighbour consultation replies - PROJECT LIGHT 2 | 15/11/2018 |
Neighbour consultation replies | 29/11/2018 |
Neighbour consultation replies | 14/11/2018 |
Neighbour consultation replies | 14/11/2018 |
Neighbour consultation replies - SURREY DOCKS WARD COUNCILLORS | 31/07/2018 |
Neighbour consultation replies - FRIENDS OF STAVE HILL & FRIENDS OF RUSSIA DOCK WOODLANDS | 17/08/2018 |
Neighbour consultation replies - PETITION OBJECTION | 25/07/2018 |
Neighbour consultation replies | 25/07/2018 |
Neighbour consultation replies - PROJECT LIGHT 1 | 19/07/2018 |
Neighbour consultation replies - LIST NO 11 | 02/07/2018 |
Neighbour consultation replies - ALFRED SALTER PRIMARY SCHOOL | 19/07/2018 |
Neighbour consultation replies - ROTHERHITHE AREA HOUSING FORUM | 19/07/2018 |
Officers Report - PLANNING COMMITTEE REPORT | 13/09/2019 |
Plan - PHASE 1 - INTERIM PETROL FILLING STATION - ARCHITECTURAL DRAWINGS | 21/06/2019 |
Plan - (01)100 REV P01 - PHASE 1 - PLOT K1 BOUNDARY | 29/05/2018 |
Plan - 37958E-01 REV ISSUE A - PHASE 1 - MASTERPLAN - TESCO PETROL STATION ELEVATIONS 1-5 | 25/05/2018 |
Plan - CWM-AAM-A2-ZZ-DR-A-07001 REV P1 - PHASE 1 - PLOT A2 BOUNDARY | 25/05/2018 |
Plan - CWM-AAM-A1-RL-DR-A-03000 REV P1 - PHASE 1 - PLOT A1 BOUNDARY | 24/05/2018 |
Plan - 802_00_SK_140 REV P1 - MASTERPLAN - ILLUSTRATIVE PHASING STRATEGY PHASE 1A DELIVERY | 24/05/2018 |
Plan - CWM-AAM-MP-ZZ-DR-A-07001 REV P1 - MASTERPLAN - PLANNING APPLICATION BOUNDARY | 24/05/2018 |
Plan - existing - CWM-AAM-A1-RL-DR-A-03001 REV P1 - PHASE 1 - PLOT A1 - EXISTING SITE PLAN | 24/05/2018 |
Plan - existing - CWM-AAM-MP-ZZ-DR-A-07010 REV P1 - MASTERPLAN - EXISTING SITE LEVELS | 24/05/2018 |
Plan - existing - CWM-AAM-MP-ZZ-DR-A-07020 REV P1 - MASTERPLAN - EXISTING SITE PLAN | 24/05/2018 |
Plan - existing - CWM-AAM-A1-ZZ-DR-A-03003 REV P1 - PHASE 1 - PLOT A1 - EXISTING NORTH AND SOUTH ELEVATIONS | 24/05/2018 |
Plan - existing - CWM-AAM-A1-ZZ-DR-A-03004 REV P1 - PHASE 1 - PLOT A1 - EXISTING EAST AND WEST ELEVATIONS | 24/05/2018 |
Plan - existing - CWM-AAM-A1-ZZ-DR-A-03005 REV P1 - PHASE 1 - PLOT A1 - CONTEXT PLAN - EXISTING SECTIONS | 24/05/2018 |
Plan - existing - (01)102 REV P01 - PHASE 1 - PLOT K1 - EXISTING SITE ELEVATIONS | 29/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07002 REV P1 - MASTERPLAN - DEMOLITION PLAN | 24/05/2018 |
Plan - proposed - 802_00_SK_095 REV P1 - MASTERPLAN - ILLUSTRATIVE PHASING STRATEGY: PUBLIC REALM DELIVERY | 24/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07011 REV P1 - MASTERPLAN - PROPOSED SITE LEVELS | 24/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07003 REV P1 - MASTERPLAN - PROPOSED DEVELOPMENT ZONES AND PUBLIC REALM | 24/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07006 REV P1 - MASTERPLAN - PROPOSED VEHICULAR ACCESS FROM PLANNING APPLICATION BOUNDARY | 24/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07004 REV P1 - MASTERPLAN - PROPOSED BUILDING LINES | 24/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07007 REV P1 - MASTERPLAN - PROPOSED SERVICING AND ACCESS | 24/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07008 REV P1 - MASTERPLAN - PROPOSED PREDOMINANT GROUND LEVEL USES | 24/05/2018 |
Plan - proposed - CWM-AAM-MP-ZZ-DR-A-07009 REV P1 - MASTERPLAN - PROPOSED PREDOMINANT UPPER LEVEL USES | 24/05/2018 |
Planning statement | 05/06/2018 |
Site Notice - SITE NOTICE LOCATIONS | 07/06/2018 |
Statutory consultee replies - TRANSPORT FOR LONDON | 13/09/2019 |
Statutory consultee replies - HISTORIC ENGLAND (JULY 2019) | 13/09/2019 |
Statutory consultee replies - GREATER LONDON AUTHORITY | 01/11/2018 |
Statutory consultee replies - HISTORIC ENGLAND | 19/07/2018 |
Statutory consultee replies - LONDON UNDERGROUND | 16/05/2019 |
Statutory consultee replies - TRANSPORT FOR LONDON | 16/04/2019 |
Statutory consultee replies - METROPOLITAN POLICE | 08/04/2019 |
Statutory consultee replies - ARQUIVA - 18/6/18 | 05/09/2018 |
Statutory consultee replies - THAMES WATER | 09/08/2018 |
Statutory consultee replies - THAMES WATER | 09/08/2018 |
Statutory consultee replies - ENVIRONMENT AGENCY | 17/07/2018 |
Statutory consultee replies - TRANSPORT FOR LONDON | 17/07/2018 |
Statutory consultee replies - MET POLICE | 12/07/2018 |
Statutory consultee replies - LONDON UNDERGROUND | 10/07/2018 |
Statutory consultee replies - METROPOLITAN POLICE | 08/08/2019 |
Superseded - CWM-AAM-A1-33-DR-A-07133 REV P1 - PHASE 1 - PLOT A1 - LEVEL 33 - PROPOSED FLOOR PLAN | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07200 REV P1 - PHASE 1 - PLOT A1 - WEST ELEVATION | 25/05/2018 |
Superseded - CWM-AAM-A1-32-DR-A-07132 REV P1 - PHASE 1 - PLOT A1 - LEVEL 32 - PROPOSED FLOOR PLAN | 25/05/2018 |
Superseded - CWM-AAM-A1-30-DR-A-07130 REV P1 - PHASE 1 - PLOT A1 - LEVEL 30 TO 31 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-29-DR-A-07129 REV P1 - PHASE 1 - PLOT A1 - LEVEL 29 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-26-DR-A-07126 REV P1 - PHASE 1 - PLOT A1 - LEVEL 26 TO 28 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-23-DR-A-07123 REV P1 - PHASE 1 - PLOT A1 - LEVEL 23 TO 25 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-18-DR-A-07117 REV P1 - PHASE 1 - PLOT A1 - LEVEL 17 TO 22 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-07-DR-A-07107 REV P1 - PHASE 1 - PLOT A1 - LEVEL 07 TO 16 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-06-DR-A-07106 REV P1 - PHASE 1 - PLOT A1 - LEVEL 06 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-05-DR-A-07105 REV P1 - PHASE 1 - PLOT A1 - LEVEL 05 - PRPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-04-DR-A-07104 REV P1 - PHASE 1 - PLOT A1 - LEVEL 04 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-03-DR-A-07103 REV P1 - PHASE 1 - PLOT A1 - LEVEL 03 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-02-DR-A-07102 REV P1 - PHASE 1 - PLOT A1 - LEVEL 02 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-01-DR-A-07101 REV P1 - PHASE 1 - PLOT A1 - LEVEL 01 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-GF-DR-A-07100 REV P1 - PHASE 1 - PLOT A1 - LEVEL 00 - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-B1-DR-A-07099 REV P1 - PHASE 1 - PLOT A1 - LEVEL BASEMENT - PROPOSED FLOOR PLAN | 24/05/2018 |
Superseded - CWM-AAM-A1-RL-DR-A-03002 REV P1 - PHASE 1 - PLOT A1 - PROPOSED SITE PLAN | 24/05/2018 |
Superseded - CWM-AAM-MP-ZZ-DR-A-07013 REV P1 - MASTERPLAN - PROPOSED INTERIM PETROL FILLING STATION | 24/05/2018 |
Superseded - CWM-AAM-MP-ZZ-DR-A-07012 REV P1 - MASTERPLAN - PROPOSED MAXIMUM HEIGHTS | 24/05/2018 |
Superseded - CWM-AAM-MP-ZZ-DR-A-07005 REV P1 - MASTERPLAN - PROPOSED BASEMENT EXTENTS | 24/05/2018 |
Superseded - PHASE 1 - PLOT K1 - AREA AND ACCOMMODATION SCHEDULE | 24/05/2018 |
Superseded - PHASE 1 - PLOT K1 - INTERNAL DAYLIGHT AND SUNLIGHT REPORT | 24/05/2018 |
Superseded - PHASE 1 - PLOT K1 - DRAWING SCHEDULE | 24/05/2018 |
Superseded - PHASE 1 - PLOT A2 - AREA SCHEDULE | 24/05/2018 |
Superseded - PHASE 1 - PLOT A2 - DRAWING SCHEDUE | 24/05/2018 |
Superseded - PHASE 1 - PLOT A1 - AREA SCHEDULE | 24/05/2018 |
Superseded - PHASE 1 - PLOT A1 - DRAWING SCHEDULE | 24/05/2018 |
Superseded - OPEN SPACE STRATEGY | 22/05/2018 |
Superseded - DESIGN GUIDELINES - PUBLIC REALM (PART 2 OF 2) | 22/05/2018 |
Superseded - DESIGN GUIDELINES - PUBLIC REALM (PART 1 OF 2) | 22/05/2018 |
Superseded - MASTERPLAN (PART 3 OF 3) | 22/05/2018 |
Superseded - MASTERPLAN (PART 2 OF 3) | 22/05/2018 |
Superseded - MASTERPLAN (PART 1 OF 3) | 22/05/2018 |
Superseded - PHASE 1 - PLOT A1: ALL EXISTING AND PROPOSED PLANS, ELEVATIONS & SECTIONS (PART 3 OF 3) | 05/06/2018 |
Superseded - PHASE 1 - PLOT A1: ALL EXISTING AND PROPOSED PLANS, ELEVATIONS & SECTIONS (PART 2 OF 3) | 05/06/2018 |
Superseded - PHASE 1 - PLOT A1: ALL EXISTING AND PROPOSED PLANS, ELEVATIONS & SECTIONS (PART 1 OF 3) | 05/06/2018 |
Superseded - PHASE 1 - PLOT A2: ALL EXISTING AND PROPOSED PLANS, ELEVATIONS & SECTIONS | 05/06/2018 |
Superseded - PHASE 1 - PLOT K1: ALL EXISTING AND PROPOSED PLANS, ELEVATIONS & SECTIONS | 05/06/2018 |
Superseded - MASTERPLAN - ADDENDUM - ARBORICULTURAL IMPACT ASSESSMENT | 08/03/2019 |
Superseded - PHASE 1 - PLOT K1: DAS ADDENDUM | 31/10/2018 |
Superseded - PHASE 1 - INTERIM PETROL STATION (IPFS) - PLANS, ELEVATIONS & AREAS | 31/10/2018 |
Superseded - PHASE 1 - PLOT A1: PLANS, ELEVATIONS, SECTIONS & AREAS (3 OF 3) | 30/10/2018 |
Superseded - PHASE 1 - PLOT A1: PLANS, ELEVATIONS, SECTIONS & AREAS (2 OF 3) | 30/10/2018 |
Superseded - PHASE 1 - PLOT A1: PLANS, ELEVATIONS, SECTIONS & AREAS (1 OF 3) | 30/10/2018 |
Superseded - PHASE 1 - PLOT A2: PLANS, ELEVATIONS, SECTIONS & AREAS | 30/10/2018 |
Superseded - PHASE 1 - PLOT K1: PLANS, ELEVATIONS, SECTIONS & AREAS | 30/10/2018 |
Superseded - (21)102 REV P01 - PHASE 1 - PLOT K1 - COURTYARD FACADE TYPICAL BAY | 29/05/2018 |
Superseded - (21)101 REV P01 - PHASE 1 - PLOT K1 - EXTERNAL FACADE TYPICAL BAY | 29/05/2018 |
Superseded - (01)313 REV P01 - PHASE 1 - PLOT K1 - SECTION DD | 29/05/2018 |
Superseded - (01)312 REV P01 - PHASE 1 - PLOT K1 - SECTION CC | 29/05/2018 |
Superseded - (01)311 REV P01 - PHASE 1 - PLOT K1 - SECTION BB | 29/05/2018 |
Superseded - (01)310 REV P01 - PHASE 1 - PLOT K1 - SECTION AA | 29/05/2018 |
Superseded - (01)214 REV P01 - PHASE 1 - PLOT K1 - PLANT ROOM ELEATIONS AND SECTIONS | 29/05/2018 |
Superseded - (01)213 REV P01 - PHASE 1 - PLOT K1 - SOUTH WEST ELEVATION | 29/05/2018 |
Superseded - (01)212 REV P01 - PHASE 1 - PLOT K1 - NORTH EAST ELEVATION | 29/05/2018 |
Superseded - (01)211 REV P01 - PHASE 1 - PLOT K1 - SOUTH EAST ELEVATION | 29/05/2018 |
Superseded - (01)210 REV P01 - PHASE 1 - PLOT K1 - NORTH WEST ELEVATION | 29/05/2018 |
Superseded - (01)116 REV P01 - PHASE 1 - PLOT K1 - ROOF PLAN | 29/05/2018 |
Superseded - (01)115 REV P01 - PHASE 1 - PLOT K1 - FIFTH FLOOR PLAN | 29/05/2018 |
Superseded - (01)114 REV P01 - PHASE 1 - PLOT K1 - FOURTH FLOOR PLAN | 29/05/2018 |
Superseded - (01)113 REV P01 - PHASE 1 - PLOT K1 - THIRD FLOOR PLAN | 29/05/2018 |
Superseded - (01)112 REV P01 - PHASE 1 - PLOT K1 - SECOND FLOOR PLAN | 29/05/2018 |
Superseded - (01)110 REV P01 - PHASE 1 - PLOT K1 - GROUND FLOOR PLAN | 29/05/2018 |
Superseded - (01)103 REV P01 - PHASE 1 - PLOT K1 - PROPOSED SITE ELEVATIONS | 29/05/2018 |
Superseded - (01)101 REV P01 - PHASE 1 - PLOT K1 - PROPOSED SITE LOCATION PLAN | 29/05/2018 |
Superseded - (01)111 REV P01 - PHASE 1 - PLOT K1 - FIRST FLOOR PLAN | 29/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07056 REV P1 - PHASE 1 - PLOT A1 - BAY STUDY - OFFICE CORE (ELEVATION WEST) | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07505 REV P1 - PHASE 1 - PLOT A1 - BAY STUDY - OFFICE C (ELEVATION WEST) | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07504 REV P1 - PHASE 1 - PLOT A1 - BAY STUDY - OFFICE B (ELEVATION SOUTH) | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07502 REV P1 - PHASE 1 - PLOT A1 - BAY STUDY - TOWER C (ELEVATION NORTH) | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07501 REV P1 - PHASE 1 - PLOT A1 - BAY STUDY - TOWER B (ELEVATION WEST) | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07500 REV P1 - PHASE 1 - PLOT A1 - BAY STUDY - TOWER A (ELEVATION EAST) | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07503 REV P1 - PHASE 1 - PLOT A1 - BAY STUDY - OFFICE A (ELEVATION EAST) | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07304 REV P1 - PHASE 1 - PLOT A1 - SECTION EE | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07303 REV P1 - PHASE 1 - PLOT A1 - SECTION DD | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07302 REV P1 - PHASE 1 - PLOT A1 - SECTION CC | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07301 REV P1 - PHASE 1 - PLOT A1 - SECTION BB | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07300 REV P1 - PHASE 1 - PLOT A1 - SECTION AA | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07203 REV P1 - PHASE 1 - PLOT A1 - SOUTH ELEVATION | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07202 REV P1 - PHASE 1 - PLOT A1 - EAST ELEVATION | 25/05/2018 |
Superseded - CWM-AAM-A1-ZZ-DR-A-07201 REV P1 - PHASE 1 - PLOT A1 - NORTH ELEVATION | 25/05/2018 |
Superseded - CWM-AAM-A1-35-DR-A-07135 REV P1 - PHASE 1 - PLOT A1 - LEVEL 35 - PROPOSED FLOOR PLAN | 25/05/2018 |
Superseded - CWM-AAM-A1-34-DR-A-07134 REV P1 - PHASE 1 - PLOT A1 - LEVEL 34 - PROPOSED FLOOR PLAN | 25/05/2018 |
Sustainability statement - PHASE 1 - PLOT K1 - SUSTAINABILITY AND ENERGY STATEMENT | 24/05/2018 |
Sustainability statement - SUSTAINABILITY STRATEGY | 23/05/2018 |
Sustainability statement - PHASE 1 - PLOT A1 - SUSTAINABILITY AND ENERGY STATEMENT | 23/05/2018 |
Sustainability statement - PHASE 1 - PLOT A2 | 24/05/2018 |
Transport statement - MASTERPLAN - ADDENDUM | 21/06/2019 |
Transport statement - MASTERPLAN - ADDENDUM | 08/03/2019 |
Transport statement - PART 1 OF 7 | 23/05/2018 |
Transport statement - PART 2 OF 7 | 23/05/2018 |
Transport statement - PART 3 OF 7 | 23/05/2018 |
Transport statement - PART 4 OF 7 | 23/05/2018 |
Transport statement - PART 5 OF 7 | 23/05/2018 |
Transport statement - MASTERPLAN - ADDENDUM | 31/10/2018 |
Transport statement - PHASE 1 - PLOT A2: TRANSPORT ADDENDUM | 31/10/2018 |
Transport statement - PHASE 1 - PLOT A1: TRANSPORT STATEMENT ADDENDUM | 31/10/2018 |
Transport statement - PHASE 1 - IPFS: TRANSPORT STATEMENT | 31/10/2018 |
Transport statement - PHASE 1 - PLOT K1: TRANSPORT ADDENDUM | 31/10/2018 |
Transport statement - PHASE 1 - PLOT K1 | 24/05/2018 |
Transport statement - PHASE 1 - PLOT A2 | 24/05/2018 |
Transport statement - PHASE 1 - PLOT A1 | 23/05/2018 |
Transport statement - PART 7 OF 7 | 23/05/2018 |
Transport statement - PART 6 OF 7 | 23/05/2018 |
Tree survey and assessment - ARBORICULTURAL IMPACT ASSESSMENT (PART 1 OF 3) | 22/05/2018 |
Tree survey and assessment - ARBORICULTURAL IMPACT ASSESSMENT (PART 2 OF 3) | 22/05/2018 |
Tree survey and assessment - ARBORICULTURAL IMPACT ASSESSMENT (PART 3 OF 3) | 22/05/2018 |
Tree survey and assessment - PHASE 1 - INTERIM PETROL STATION (IPFS): ARBORICULTURAL IMPACT ASSESSMENT | 31/10/2018 |
Tree survey and assessment - MASTERPLAN - ADDENDUM - ARBORICULTURAL IMPACT ASSESSMENT (ISSUE 7) | 14/03/2019 |
Tree survey and assessment - MASTERPLAN - ADDENDUM - ARBORICULTURAL IMPACT ASSESSMENT | 31/10/2018 |
Viability Report - BNPP VIABILITY UPDATE & NIL GRANT APPRAISAL (MAY 19) | 13/09/2019 |
Viability Report - BNPP RESPONSE TO HOUSING STATEMENT ADDENDUM (JULY 19) | 13/09/2019 |
Viability Report - BNPP REVIEW OF AFFORDABLE HOUSING & VIABILITY STATEMENT (DEC 18) | 13/09/2019 |
Viability Report - BNPP LETTER CONFIRMING VIABILITY POSITION (JULY 19) | 13/09/2019 |