Amended plan - 5763 T2B4(20) D01 REV P4 - BLOCK B4 DETAILS BAY STUDY 0121/05/2019
Amended plan - AMENDED DESIGN AND ACCESS STATEMENT - PART 3 OF 1121/05/2019
Amended plan - 5763 T2(20) S08 REV P5 - PROPOSED SITE SECTIONS - SECTION S0821/05/2019
Amended plan - 5763 T2(20) S07 REV P5 - PROPOSED SITE SECTIONS - SECTION S0721/05/2019
Amended plan - 5763 T2(20) S06 REV P4 - PROPOSED SITE SECTION - SECTION S0621/05/2019
Amended plan - 5763 T2(20) S05 REV P5 - PROPOSED SITE SECTION - SECTION S0521/05/2019
Amended plan - 5763-doc-149-190408 Masterplan heights21/05/2019
Amended plan - 5763 T2B4(20) D02 REV P4 - BLOCK B4 DETAILS BAY STUDY 0221/05/2019
Amended plan - 5763 T2B4(20) D03 REV P2 - BLOCK B4 DETAILS BAY STUDY 0321/05/2019
Amended plan - 5763 T2B4(20) P23 REV P3 - BLOCK B4 PROPOSED 23-30TH FLOOR PLAN21/05/2019
Amended plan - 5763 T2B4(20) P31 REV P3 - PROPOSED 31ST FLOOR PLAN21/05/2019
Amended plan - 5763 T2B9(20) D01 REV P4 - BLOCK B9 DETAILS BAY STUDY 0121/05/2019
Amended plan - 5763 T2B9 (20) E01 REV P6 - PROPOSED NORTH ELEVATION21/05/2019
Amended plan - 5763 T2B9 (20) E02 REV P6 - PROPOSED WEST ELEVATION21/05/2019
Amended plan - 5763 T2B9 (20) E03 REV P6 - PROPOSED SOUTH ELEVATION21/05/2019
Amended plan - 5763 T2B9 (20) E04 REV P6 - PROPOSED EAST ELEVATION21/05/2019
Amended plan - 5763 T2B9 (20) P07 REV P3 - PROPOSED ROOF TERRACE21/05/2019
Amended plan - 5763 T2B9 (20) P08 REV P1 - PROPOSED ROOF PLAN21/05/2019
Amended plan - 5763 T2B9 (20) D01 REV P4 - DETAIL BAY STUDY 0121/05/2019
Amended plan - 5763 TB10(20) D02 REV P4 - BLOCK B10 ETAILS BAY STUDY 0221/05/2019
Amended plan - 5763 TB12(20) D01 REV P2 - BLOCK B12 D ETAILS BAY STUDY 0121/05/2019
Amended plan - 5763 T1 (90) P100 RREV P4 - PROPOSED DEVELOPMENT ZONES AND ACCESS POINTS - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P101 RREV P4 - PROPOSED GROUND FLOOR LEVELS (AOD) - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P103 REV P4 -PUBLIC REALM AND LANDSCAPE PLAN - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P104 RREV P4 - PROPOSED PROPOSED LAND USE GROUND FLOOR PLAN - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P105 REV P4 - PROPOSED PROPOSED LAND USE FIRST FLOOR PLAN - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P106 RREV P4 - PROPOSED PROPOSED LAND USE UPPER FLOOR PLAN - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P107 RREV P5 - DEVELOPMENT MAXIMUM HEIGHTS - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P109 REV P6 - PHASING PLAN - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P112 RREV P4 - DEVELOPMENT BLOCK GROUND FLOOR MANIMUM/MAXIMUM ALIGNMENTS - PARAMETER PLANS21/05/2019
Amended plan - 5763 T1 (90) P113 RREV P4 - DEVELOPMENT BLOCK UPPER FLOOR MANIMUM/MAXIMUM ALIGNMENTS - PARAMETER PLANS21/05/2019
Amended plan - 5763 T2(20) P-1 REV P5 - PROPOSED BASEMENT PLAN - GENERAL ARRANGEMENT21/05/2019
Amended plan - 5763 T2(20) P01 REV P5 - PROPOSED FIRST PLAN - GENERAL ARRANGEMENT21/05/2019
Amended plan - 5763 T2(20) P02 REV P5 - PROPOSED SECOND FLOOR PLAN - GENERAL ARRANGEMENT21/05/2019
Amended plan - 5763 T2(20) P08 REV P6 - PROPOSED 8TH FLOOR PLAN - GENERAL ARRANGEMENT21/05/2019
Amended plan - 5763 T2(20) P015REV P3 - PROPOSED 15TH FLOOR PLAN - GENERAL ARRANGEMENT21/05/2019
Amended plan - 5763 T2(20) P032 REV P3 - PROPOSED 32ND FLOOR PLAN - GENERAL ARRANGEMENT21/05/2019
Amended plan - 5763 T2(20) P044 REV P3 - PROPOSED ROOF PLAN - GENERAL ARRANGEMENT21/05/2019
Amended plan - 5763 T2(20) S015 REV P5 - PROPOSED SITE SECTION - SECTION S0121/05/2019
Amended plan - 5763 T2(20) S02 REV P5 - PROPOSED SITE SECTION - SECTION S0221/05/2019
Amended plan - 5763 T2(20) S03 REV P4 - PROPOSED SITE SECTIONS - SECTION S0321/05/2019
Amended plan - 5763 T2(20) S04 5REV P5 - PROPOSED SITE SECTIONS - SECTION S0421/05/2019
Application form17/07/2017
Application form - NOTICE UNDER ARTICLE 1302/08/2017
Application form - NOTICE UNDER ARTICLE 1330/10/2018
Application: Amending letter31/10/2018
Application: Covering letter - APRIL 201905/04/2019
Application: Covering letter17/07/2017
Community Infrastructure Levy (CIL) Notices30/10/2018
Community Infrastructure Levy (CIL) general - CIL PHASING LETTER MARCH 201905/04/2019
Community Infrastructure Levy (CIL) general - CIL INFORMATION FORM05/04/2019
Consultation List29/08/2017
Consultation List - DEVELOPMENT CONSULTATION CHARTER30/05/2019
Consultation List - DEVELOPMENT CONSULTATION CHARTER30/05/2019
Daylight/Sunlight assessment - REVISED CHAPTER 10 DAYLIGHT AND SUNLIGHT07/05/2019
Daylight/Sunlight assessment - DAYLIGHT AND SUNLIGHT WITHIN THE PROPOSED DWELLINGS07/11/2018
Daylight/Sunlight assessment05/04/2019
Design and access statement - ADDENDUM - VOLUME 2 - PART 3 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 2 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 1 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 13 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 12 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 11 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 10 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 9 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 8 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 7 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 6 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 5 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 4 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 3 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 2 OF 1307/11/2018
Design and access statement - ADDENDUM - VOLUME 1 - PART 1 OF 1307/11/2018
Design and access statement - ADDENDUM - DESIGN PRINCIPLES - PART 4 OF 407/11/2018
Design and access statement - ADDENDUM - DESIGN PRINCIPLES - PART 3 OF 407/11/2018
Design and access statement - ADDENDUM - DESIGN PRINCIPLES - PART 2 OF 407/11/2018
Design and access statement - ADDENDUM - DESIGN PRINCIPLES - PART 1 OF 407/11/2018
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 5 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 11 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 10 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 9 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 8 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 7 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 7 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 6 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 4 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 2 OF 1111/04/2019
Design and access statement - AMENDED DESIGN AND ACCESS STATEMENT - PART 1 OF 1111/04/2019
Design and access statement - VOLUME 3 APPENDICES - MARCH 201905/04/2019
Design and access statement - VOLUME 205/04/2019
Design and access statement - VOLUME 105/04/2019
Design and access statement - SUMMARY PART 112/11/2018
Design and access statement - SUMMARY PART 212/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 19 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 18 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 17 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 16 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 15 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 14 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 13 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 12 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 11 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 10 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 9 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 8 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 7 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 6 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 4 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 3 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 2 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 5 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 3 - PART 1 OF 19 - APPENDICES07/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 10 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 9 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 8 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 7 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 6 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 5 OF 1007/11/2018
Design and access statement - ADDENDUM - VOLUME 2 - PART 4 OF 1007/11/2018
Document - DELIVERY SERVICE MANAGEMENT PLAN02/08/2017
Document - CAR PARK MANAGEMENT PLAN07/11/2018
Document - EMPLOYMENT STRATEGY07/11/2018
Document - DRP REPORT09/07/2018
Document - UNIT SCHEDULE MARCH 201905/04/2019
Document - DESIGN PRINCIPLES MARCH 201905/04/2019
Document - PLANNING DRAWING LIST - MARCH 201905/04/2019
Document - NON TECHNICAL SUMMARY - APRIL 201905/04/2019
Document - FIRE STRATEGY SUMMARY05/04/2019
Document - DEVELOPMENT SPECIFICATION - ADDENDUM VERSION APRIL 201905/04/2019
Document - ACCOMMODATION SCHEDULE20/11/2018
Document - TV AND RADIO DESKTOP STUDY - ADDENDUM31/10/2018
Document - TELECOMMUNICATIONS IMPACT ASSESSMENT - ADDENDUM31/10/2018
Document - STATEMENT OF COMMUNITY INVOLVEMENT - ADDENDUM31/10/2018
Document - EMPLOYMENT REPORT31/10/2018
Document - ECOLOGY APPRAISAL31/10/2018
Document - DRAFT CEMP - ADDENDUM31/10/2018
Document - ADDENDUM - DEVELOPMENT SPECIFICATION31/10/2018
Document - CIL PHASING LETTER30/10/2018
Document - SUMMARY OF SCHEME EVOLUTION 2017 TO 2018 - PART 1 OF 213/11/2018
Document - BASEMENT IMPACT ASSESSMENT - APPENDIX 1 OF 212/11/2018
Document - BASEMENT IMPACT ASSESSMENT - APPENDIX 2 OF 212/11/2018
Document - BASEMENT IMPACT ASSESSMENT12/11/2018
Document - DAS - SUMMARY STATEMENT - PART 2 OF 207/11/2018
Document - DAS - SUMMARY STATEMENT - PART 1 OF 207/11/2018
Document - DEVELOPMENT SPECIFICATION - ADDENDUM07/11/2018
Energy statement05/04/2019
Energy statement - PART 5 OF 513/11/2018
Energy statement - PART 1 OF 513/11/2018
Energy statement - PART 3 OF 513/11/2018
Energy statement - PART 2 OF 513/11/2018
Energy statement - PART 4 OF 513/11/2018
Environmental Statement - PART 805/04/2019
Environmental Statement - PART 705/04/2019
Environmental Statement - PART605/04/2019
Environmental Statement - PART 505/04/2019
Environmental Statement - PART 405/04/2019
Environmental Statement - PART 305/04/2019
Environmental Statement - PART 205/04/2019
Environmental Statement - PART 105/04/2019
Environmental Statement - ES ADDENDUM APRIL 201905/04/2019
Environmental Statement - APPENDICES - APPENDIX 16.107/11/2018
Environmental Statement - APPENDICES - APPENDIX 15.607/11/2018
Environmental Statement - APPENDICES - APPENDIX 15.507/11/2018
Environmental Statement - APPENDICES - APPENDIX 15.407/11/2018
Environmental Statement - APPENDICES - APPENDIX 15.307/11/2018
Environmental Statement - APPENDICES - APPENDIX 15.207/11/2018
Environmental Statement - APPENDICES - APPENDIX 15.107/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.1107/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.1007/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.907/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.807/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.707/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.607/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.507/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.407/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.307/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.207/11/2018
Environmental Statement - APPENDICES - APPENDIX 14.107/11/2018
Environmental Statement - APPENDICES - APPENDIX 13.307/11/2018
Environmental Statement - APPENDICES - APPENDIX 13.207/11/2018
Environmental Statement - APPENDICES - APPENDIX 13.107/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.5 - PART 2C OF 207/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.5 - PART 2B OF 207/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.5 - PART 1 OF 207/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.407/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.3 - PART 6 OF 607/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.5 - PART 2A OF 207/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.3 - PART 5 OF 607/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.3 - PART 4 OF 607/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.3 - PART 2 OF 607/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.3 - PART 1 OF 607/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.3 - PART 3 OF 607/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.1 - PART 2 OF 207/11/2018
Environmental Statement - APPENDICES - APPENDIX 12.1 - PART 1 OF 207/11/2018
Environmental Statement - APPENDICES - APPENDIX 2.207/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.2 - PART 6 OF 606/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.2 - PART 5 OF 606/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.2 - PART 4 OF 606/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.2 - PART 3 OF 606/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.2 - PART 2 OF 606/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.2 - PART 1 OF 606/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 10 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 9 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 8 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 7 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 6 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 5 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 4 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 3 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 11.1 - PART 2 OF 1006/11/2018
Environmental Statement - APPENDICES -APPENDIX 11.1 - PART 1 OF 1006/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.406/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.3 - PART 4 OF 406/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.3 - PART 3 OF 406/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.3 - PART 2 OF 406/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.3 - PART 1 OF 406/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.2 - PART 3 OF 306/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.2 - PART 2 OF 306/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.2 - PART 1 OF 306/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 17 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 16 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 15 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 14 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 13 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 12 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 11 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 10 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 9 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 8 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 7 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 6 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 5 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 3 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 2 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 1 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 10.1 - PART 4 OF 1706/11/2018
Environmental Statement - APPENDICES - APPENDIX 8.831/10/2018
Environmental Statement - APPENDICES - APPENDIX 8.731/10/2018
Environmental Statement - APPENDICES - APPENDIX 8.631/10/2018
Environmental Statement - APPENDICES - APPENDIX 8.531/10/2018
Environmental Statement - APPENDICES - APPENDIX 8.431/10/2018
Environmental Statement - APPENDICES - APPENDIX 8.331/10/2018
Environmental Statement - APPENDICES - APPENDIX 8.231/10/2018
Environmental Statement - APPENDICES - APPENDIX 8.131/10/2018
Environmental Statement - APPENDICES - APPENDIX 7.731/10/2018
Environmental Statement - APPENDICES - APPENDIX 7.631/10/2018
Environmental Statement - APPENDICES - APPENDIX 7.531/10/2018
Environmental Statement - APPENDICES - APPENDIX 7.431/10/2018
Environmental Statement - APPENDICES - APPENDIX 7.331/10/2018
Environmental Statement - APPENDICES - APPENDIX 7.231/10/2018
Environmental Statement - APPENDICES - APPENDIX 7.131/10/2018
Environmental Statement - APPENDICES - APPENDIX 5.231/10/2018
Environmental Statement - APPENDICES - APPENDIX 5.131/10/2018
Environmental Statement - APPENDICES - APPENDIX 3.131/10/2018
Environmental Statement - APPENDICES - APPENDIX 5.331/10/2018
Environmental Statement - APPENDICES - APPENDIX 1.331/10/2018
Environmental Statement - APPENDICES - APPENDIX 1.231/10/2018
Environmental Statement - APPENDICES - APPENDIX 1.131/10/2018
Environmental Statement - APPENDICES - APPENDIX 1.0 - COVER SHEET31/10/2018
Environmental Statement - VOLUME 231/10/2018
Environmental Statement - VOLUME 131/10/2018
Environmental Statement - ES Chapter 15 reformatted27/11/2018
Heads of Teams - s106 - DRAFT HEADS OF TERMS - ADDENDUM30/10/2018
Heads of Teams - s106 - s106 heads of terms 28.5.1931/05/2019
Heads of Teams - s106 - S106 HEADS OF TERMS 14.5.1931/05/2019
Neighbour consultation replies - 04/01/201804/01/2018
Officers Report - ITEM 1 - RECOMMENDATION31/05/2019
Officers Report - COMMITTEE REPORT - 28/9/1929/05/2019
Plan - REVISED MASTERPLAN HEIGHTS11/04/2019
Planning Letters & Memos - LETTER FROM APPLICANT TO COUNCIL RE SPACE STUDIOS ACCESS28/05/2019
Planning statement - PLANNING STATEMENT - ADDENDUM31/10/2018
Planning statement05/04/2019
Site location plan - P6184/LP1 - SITE LOCATION PLAN17/07/2017
Statutory consultee replies - THAMES WATER16/05/2019
Statutory consultee replies - THAMES WATER13/02/2019
Statutory consultee replies - TFL04/12/2018
Statutory consultee replies - HISTORIC ENGLAND23/11/2018
Statutory consultee replies - Arqiva23/11/2018
Statutory consultee replies - MET POLICE20/11/2018
Statutory consultee replies - HISTORIC ENGLAND16/05/2019
Statutory consultee replies - NATURAL ENGLAND13/09/2017
Statutory consultee replies - LONDON UNDERGROUND06/09/2017
Statutory consultee replies - TRANSPORT FOR LONDON25/02/2019
Statutory consultee replies - THAMES WATER13/02/2019
Statutory consultee replies - THAMES WATER16/05/2019
Statutory consultee replies - METROPOLITAN POLICE SERVICE14/09/2017
Statutory consultee replies - SOUTHWARK PUBLIC HEALTH19/09/2017
Statutory consultee replies - HISTORIC ENGLAND16/05/2019
Statutory consultee replies - LONDON UNDERGROUND23/05/2019
Statutory consultee replies - ARQIVA23/05/2019
Statutory consultee replies - VITAL OKR13/06/2019
Statutory consultee replies - LONDON FIRE BRIGADE13/06/2019
Statutory consultee replies - GREATER LONDON AUTHORITY06/02/2019
Statutory consultee replies - LONDON FIRE AND EMERGENCY PLANNING AUTHORITY05/12/2018
Statutory consultee replies - HISTORIC ENGLAND05/10/2017
Statutory consultee replies - HISTORIC ENGLAND05/10/2017
Statutory consultee replies - THAMES WATER05/10/2017
Statutory consultee replies - TRANSPORT FOR LONDON03/10/2017
Superseded - NON TECHNICAL SUMMARY31/10/2018
Sustainability statement - SOCIAL SUSTAINABILITY REPORT31/10/2018
Sustainability statement31/10/2018
Tree survey and assessment30/10/2018
Viability Report - VIABILITY SUMMARY17/05/2019
Viability Report - COUNCIL'S ASSESSMENT OF APPLICANT VIABILITY APPRAISAL24/05/2019
Viability Report - APPLICANT VIABILITY APPRAISAL24/05/2019
Viability Report - APPLICANT LETTER CONFIRMING AGREEMENT OF COUNCIL VIABILITY REVIEW24/05/2019
Viability Report - APPLICANT LETTER TO MOVE TO 40% AFFORDABLE HOUSING24/05/2019
Waste Management Strategy - MALT ST REFUSE COLLECTION CORRECTION01/05/2019
Waste Management Strategy - WASTE REPORT31/10/2018