Documents for case: 16/AP/4458
Total documents: 362
Order by:
DocumentDate
Affordable housing statement15/11/2016
Amended plan - Overshadowing assessment to PROPOSED FLATS.03/01/2018
Amended plan - UPDATED AFFORDABLE HOUSING OFFER25/01/2018
Amended plan - Updated bat survey20/10/2017
Amended plan - 935_02_07_100 REV P2 - WEST SITE - GROUND FLOOR PLAN15/08/2017
Amended plan - 935_02_07_212 REV P2 - WEST SITE - SOUTH ELEVATION15/08/2017
Amended plan - 935_02_07_211 REV P2 - WEST SITE - ST GEORGE'S ROAD ELEVATION15/08/2017
Amended plan - 935_02_07_210 REV P2 - WEST SITE - NEWINGTON BUTTS ELEVATION15/08/2017
Amended plan - 935_02_07_100 REV P3 - WEST SITE - GROUND FLOOR PLAN15/08/2017
Amended plan - 935_00_07_002 REV P2 - PROPOSED SITE LOCATION PLAN13/03/2017
Amended plan - 935_01_07_216 REV P2 - EAST SITE - STATION ROUTE ELEVATION 215/08/2017
Amended plan - 935_01_07_101 REV P2 - EAST SITE - FIRST FLOOR PLAN15/08/2017
Amended plan - 935_01_07_100 REV P2 - EAST SITE - GROUND FLOOR PLAN15/08/2017
Amended plan - 935_01_07_99 REV P2 - BASEMENT MEZZANINE PLAN15/08/2017
Amended plan - 935_01_07_098 REV P2 - EAST SITE - BASEMENT PLAN15/08/2017
Amended plan - 935_00_07_200 REV P2 - SITE NORTH ELEVATION15/08/2017
Amended plan - 935_00_07_004 REV P2 - SITE - GROUND PLAN15/08/2017
Amended plan - 935_00_07_003 REV P2 - SITE - ROOF PLAN15/08/2017
Amended plan - 935_00_07_002 REV P2 - PROPOSED SITE LOCATION PLAN15/08/2017
Amended plan - 935_00_07_001 REV P2 - EXISTING SITE LOCATION PLAN13/03/2017
Amended plan - 935_01_07_310 REV P3 - EAST SITE - SECTION AA15/08/2017
Application form07/12/2017
Application form - INCLUDING OWNERSHIP CERTIFICATE01/11/2016
Application: Amending letter - APPLICANT'S REVISED OFFER LETTER FEBRUARY 201813/02/2018
Application: Amending letter - On-site affordable retail letter04/01/2018
Application: Covering letter - ETC COVERING LETTER JUNE 201819/06/2018
Application: Covering letter15/08/2017
Application: Covering letter01/11/2016
Consultation List04/01/2017
Daylight/Sunlight assessment - APPENDIX 1 OF 301/11/2016
Daylight/Sunlight assessment - APPENDIX 2 OF 301/11/2016
Daylight/Sunlight assessment - APPENDIX 3 OF 301/11/2016
Daylight/Sunlight assessment - ADDENDUM13/03/2017
Daylight/Sunlight assessment01/11/2016
Daylight/Sunlight assessment - OVERSHADOWING ASSESSMENTS - 26TH JULY 201715/08/2017
Daylight/Sunlight assessment - OVERSHADOWING ASSESSMENTS - 29/6/1805/07/2018
Daylight/Sunlight assessment - OVERSHADOWING ASSESSMENTS - 29/6/1805/07/2018
Daylight/Sunlight assessment - OVERSHADOWING ASSESSMENTS - 9TH SEPTEMBER 201615/08/2017
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 6 OF 11 - EAST SITE - PARK ROUTE ARCHES01/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 5 OF 11 - EAST SITE - FOOTBRIDGES01/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 4 OF 11 - EAST SITE - PLOT 401/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 3 OF 11 - PLOT E3 - BUILDING E301/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 2 OF 11 - PLOT E2 - BUILDING E201/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 1 OF 11 - PLOT E1 - UAL;LCC BUILDING01/11/2016
Design and access statement - CHAPTER 4 - MASTERPLAN; DESIGN PRINCIPLES AND CONCEPTS01/11/2016
Design and access statement - CHAPTER 3 - DESIGN OBJECTIVES AND DESIGN EVOLUTION01/11/2016
Design and access statement - CHAPTER 2 - SITE, CONTEXT AND ANALYSIS01/11/2016
Design and access statement - CHAPTER 1 - INTRODUCTION01/11/2016
Design and access statement - CONTENTS01/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 7 OF 11 - EAST SITE - BELOW GROUND01/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 8 OF 11 - WEST SITE - PLOT W101/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 9 OF 11 - WEST SITE - PLOT W201/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 10 OF 11 - WEST SITE - W301/11/2016
Design and access statement - CHAPTER 5 - DETAILED DESIGN - PART 11 OF 11 - WEST SITE - BELOW GROUND01/11/2016
Design and access statement - CHAPTER 6 - LANDSCAPE01/11/2016
Design and access statement - CHAPTER 7 - ACCESS AND INCLUSIVITY01/11/2016
Design and access statement - ADDENDUM - PART 1 OF 315/08/2017
Design and access statement - ADDENDUM - PART 3 OF 315/08/2017
Design and access statement - ADDENDUM - PART 2 OF 315/08/2017
Document - ENVIRONMENTAL STATEMENT - VOLUME 3 - TOWNSCAPE, BUILT HERITAGE AND VISUAL ASSESSMENT - PART 1 OF 403/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 16.1 - 16.9 - PART 7 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 16.1 - 16.9 - PART 6 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 16.1 - 16.9 - PART 5 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 16.1 - 16.9 - PART 4 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 16.1 - 16.9 - PART 3 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 16.1 - 16.9 - PART 2 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 16.1 - 16.9 - PART 1 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - FIGURES 13.1 - 14.14 - PART 7 OF 703/11/2016
Document - ENVIRONMENTAL STATEMENT - NON TECHNICAL SUMMARY - PART 1 OF 301/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 12 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 11 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 10 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 9 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 8 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 7 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 6 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 5 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 4 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 3 OF 1201/11/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 2 OF 1201/11/2016
Document - RESPONSE TO HILSON MORAN PEER REVIEW 09.01.201725/01/2017
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES - PART 4 OF 419/06/2018
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES - PART 3 OF 419/06/2018
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES - PART 2 OF 419/06/2018
Document - STATEMENT OF COMMUNITY INVOLVEMENT - APPENDICES - PART 1 OF 419/06/2018
Document - CONSULTATION SENT LIST08/01/2018
Document - TRADE SUPPORT OFFER UPDATE14/11/2017
Document - BREAKDOWN OF LAND USES24/08/2017
Document - Draft local business support and relocation strategy22/08/2017
Document - WIND IMPACT RESPONSE TO MET TABERNACLE15/08/2017
Document - WATERMAN - EIA LETTER 19/6/1715/08/2017
Document - TAVERNOR RESPONSE TO OBJECTION15/08/2017
Document - WIND FIGURES15/08/2017
Document - RESIDENTIAL UNIT MIX - WEST SITE15/08/2017
Document - RSIDENTIAL UNIT TYPES - MANSION BLOCKS15/08/2017
Document - RESIDENTIAL UNIT TYPES - COMBINED15/08/2017
Document - AREA SCHEDULE - WEST SITE15/08/2017
Document - RESIDENTIAL UNIT TYPES SCHEDULE15/08/2017
Document - AREA SCHEDULE - EAST SITE15/08/2017
Document - AREA SCHEDULE - ELEPHANT AND CASTLE15/08/2017
Document - EQUALITIES STATEMENT - ADDENDUM15/08/2017
Document - WIND IMPACT RESPONSE TO MET TABERNACLE23/06/2017
Document - REPLY LETTER TO MET TABERNACLE ABOUT DRAINAGE23/06/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - LETTER INFORMING OF THE POSTPONMENT OF 18 DECEMBER PLANNING COMMITTEE15/12/2017
Document - UPDATED EIA LETTER FEBRUARY 201813/02/2018
Document - ADDITIONAL EQUALITIES INFORMATION FEBRUARY 201813/02/2018
Document - DRP 2 REPORT05/05/2016
Document - Transport Assessment addendum31/08/2017
Document - Affordable housing addendum31/08/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - ACCOMMODATION SCHEDULES19/06/2017
Document - ELEPHANT AND CASTLE- COMMENTARY ON THE SECTIONS THROUGH THE SITE05/04/2017
Document - BASEMENT IMPACT ASSESSMENT PART 129/03/2017
Document - TOWN VIEW ASSESSMENT POINT 23A.128/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 1617/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 1517/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 1417/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 1317/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 1217/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 1117/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 1017/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 917/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 817/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 717/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 617/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 517/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 417/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 317/03/2017
Document - BASEMENT IMPACT ASSESSMENT PART 217/03/2017
Document - Sustainability document (responses to GLA comments)14/02/2017
Document - CONSULTATION LETTER SENT OUT ON THE 20/12/201604/01/2017
Document - LIST OF CONSULTATIONS AND NOTIFICATIONS THAT WERE SENT ON THE 20.12.201620/12/2016
Document - SAMPLE OF NEIGHBOUR LETTER WITH CONSULTATION PERIOD OF 28 DAYS20/12/2016
Document - EQUALITIES STATEMENT18/11/2016
Document - 935_02 - WEST SIDE RESIDENTIAL BUILDINGS IN PLOTS W1 AND W2 - RESIDENTIAL UNIT TYPES03/11/2016
Document - 935_01 - EAST SITE RESIDENTIAL BUILDINGS03/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 3 - TOWNSCAPE, BUILT HERITAGE AND VISUAL ASSESSMENT - PART 4 OF 403/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 3 - TOWNSCAPE, BUILT HERITAGE AND VISUAL ASSESSMENT - PART 3 OF 403/11/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 3 - TOWNSCAPE, BUILT HERITAGE AND VISUAL ASSESSMENT - PART 2 OF 403/11/2016
Energy statement03/11/2016
Neighbour consultation replies10/07/2018
Neighbour consultation replies - 35% CAMPAIGN16/11/2017
Neighbour consultation replies - 23/9/1727/09/2017
Neighbour consultation replies - 25/9/1727/09/2017
Neighbour consultation replies10/07/2018
Neighbour consultation replies - 29/6/1803/07/2018
Neighbour consultation replies - 26/6/1803/07/2018
Neighbour consultation replies - LIST 500302/07/2018
Neighbour consultation replies28/06/2018
Neighbour consultation replies - LATIN ELEPHANT27/06/2018
Neighbour consultation replies - 4131 LETTER OF SUPPORT25/06/2018
Neighbour consultation replies - SOUTHWARD LAW CENTRE 18/6/1822/06/2018
Neighbour consultation replies14/06/2018
Neighbour consultation replies12/03/2018
Neighbour consultation replies - 12/3/1812/03/2018
Neighbour consultation replies09/03/2018
Neighbour consultation replies05/03/2018
Neighbour consultation replies10/01/2018
Neighbour consultation replies - 11/12/1715/12/2017
Neighbour consultation replies28/06/2017
Neighbour consultation replies23/06/2017
Neighbour consultation replies - LETTER DATED 2 JUNE 201716/06/2017
Neighbour consultation replies - LETTER DATED 8 JUNE 201716/06/2017
Neighbour consultation replies - LETTER DATED 6 FEBRUARY 201716/06/2017
Neighbour consultation replies05/04/2017
Neighbour consultation replies30/03/2017
Noise impact assessment - WATERMAN - NOISE EMISSIONS CORSICA STUDIOS BRIEFING NOTE 10.4.1715/08/2017
Noise impact assessment - WATERMAN - CORSICA STUDIOS AND INTERIM CONSTRUCTION PHASE - TECHNICAL NOTE 19/6/1715/08/2017
Noise impact assessment - ACOUSTIC DESIGN CORSICA STUDIES AFFECTING SOUTH EAST BLOCK15/08/2017
Officers Report - OFFICERS REPORT AND RECOMMENDATION FOR THE 16 JANUARY 2018 PLANNING COMMITTEE08/01/2018
Photographs and photomontages15/08/2017
Photographs and photomontages15/08/2017
Plan - 935_01_07_312 REV P1 - EAST SITE - SECTION CC04/11/2016
Plan - 935_01_07_311 REV P1 - EAST SITE - SECTION BB04/11/2016
Plan - 935_01_07_310 REV P1 - EAST SITE - SECTION AA04/11/2016
Plan - 935_01_07_218 REV P1 - EAST SITE - PARK ROUTE ELEVATION 204/11/2016
Plan - 935_01_07_217 REV P1 - EAST SITE - PARK ROUTE ELEVATION 104/11/2016
Plan - 935_01_07_216 REV P1 - EAST SITE - STATION ROUTE ELEVATION 204/11/2016
Plan - 935_01_07_215 REV P1 - EAST SITE - STATION ROUTE ELEVATION 104/11/2016
Plan - 935_01_07_214 REV P1 - EAST SITE - WEST ELEVATION04/11/2016
Plan - 935_01_07_213 REV P1 - EAST SITE - SOUTH ELEVATION04/11/2016
Plan - 935_01_07_212 REV P1 - EAST SITE - EAST ELEVATION04/11/2016
Plan - 935_01_07_211 REV P1 - EAST SITE - NORTH ELEVATION04/11/2016
Plan - 935_01_07_210 REV P1 - EAST SITE - PENINSULA ELEVATION04/11/2016
Plan - 935_01_07_135 REV P1 - EAST SITE - ROOF PLAN04/11/2016
Plan - 935_01_07_134 REV P1 - EAST SITE - THIRTIETH FLOOR PLAN (PLANT)04/11/2016
Plan - 935_01_07_129 REV P1 - EAST SITE - TWENT-NINETH FLOOR PLAN04/11/2016
Plan - 935_01_07_128 REV P1 - EAST SITE - TWENTY-EIGHTH FLOOR PLAN04/11/2016
Plan - 035_01_07_126 REV P1 - EAST SITE - TWENTY-SIXTH FLOOR PLAN04/11/2016
Plan - 935_01_07_122 REV P1 - EAST SITE - TWENTY-SECOND TO TWENTY-SEVENTH FLOOR04/11/2016
Plan - 935_01_07_121 REV P1 - EAST SITE - TWENTY-FIRST FLOOR04/11/2016
Plan - 935_01_07_120 REV P1 - EAST SITE - TWENTIETH FLOOR PLAN04/11/2016
Plan - 935_01_07_117 REV P1 - EAST SITE - SEVENTEENTH TO NINETEENTH FLOOR04/11/2016
Plan - 935_01_07_116 REV P1 - EAST SITE - SIXTEENTH FLOOR PLAN03/11/2016
Plan - 935_01_07_112 REV P1 - EAST SITE - TWELFTH TO FITHTEENTH FLOOR03/11/2016
Plan - 935_01_07_111 REV P1 - EAST SITE - ROOF PLAN03/11/2016
Plan - 935_01_07_110 REV P1 - EAST SITE - TENTH FLOOR PLAN03/11/2016
Plan - 935_01_07_109 REV P1 - EAST SITE - NINTH FLOOR PLAN03/11/2016
Plan - 935_01_07_108 REV P1 - EAST SITE - EIGHTH FLOOR PLAN03/11/2016
Plan - 935_01_07_107 REV P1 - EAST SITE - SEVENTH FLOOR PLAN03/11/2016
Plan - 935_01_07_106 REV P1 - EAST SITE - SIXTH FLOOR PLAN03/11/2016
Plan - 935_01_07_105 REV P1 - EAST SITE - FIFTH FLOOR PLAN03/11/2016
Plan - 935_01_07_104 REV P1 - EAST SITE - FOURTH FLOOR PLAN03/11/2016
Plan - 935_01_07_103 REV P1 - EAST SITE - THIRD FLOOR PLAN03/11/2016
Plan - 935_01_07_102 REV P1 - EAST SITE - SECOND FLOOR PLAN03/11/2016
Plan - 935_01_07_101 REV P1 - EAST SITE - FIRST FLOOR PLAN03/11/2016
Plan - 935_01_07_100 REV P1 - EAST SITE - GROUND FLOOR PLAN03/11/2016
Plan - 935_01_07_99 REV P1 - BASEMENT MEZZANINE PLAN03/11/2016
Plan - 935_01_07_098 REV P1 - EAST SITE - BASEMENT PLAN03/11/2016
Plan - 935_00_07_302 REV P1 - SITE SECTION CC03/11/2016
Plan - 935_00_07_301 REV P1 - SITE SECTION BB03/11/2016
Plan - 935_00_07_300 REV P1 - SITE SECTION AA03/11/2016
Plan - 935_00_07_200 REV P1 - SITE NORTH ELEVATION03/11/2016
Plan - 935_00_07_010 REV P1 - SITE - KEY PLAN03/11/2016
Plan - 935_00_07_006 REV P1 - SITE - BASEMENT LEVEL B203/11/2016
Plan - 935_00_07_005 REV P1 - SITE - BASEMENT LEVEL B103/11/2016
Plan - 935_00_07_004 REV P1 - SITE - GROUND PLAN03/11/2016
Plan - 935_00_07_003 REV P1 - SITE ROOF PLAN03/11/2016
Plan - 935-01-07-098- EAST SITE - BASEMENT PLAN11/12/2017
Plan - 93501-07-101- FIRST FLOOR PLAN11/12/2017
Plan - 935-01-07-102- SECOND FLOOR PLAN11/12/2017
Plan - Fig 2 North-South transsects through the sites, showing current basements, natural geology and archaeological survival05/04/2017
Plan - Fig 1 West – East transects through the sites, showing current basements, natural geology and archaeological survival05/04/2017
Plan - TOWN617(08)3113 - ELEPHNT TOWN CENTRE - WEST SITE - W2 - TOWER 3 - 27TH FLOOR SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(08)3112 - ELEPHANT TOWN CENTRE - WEST SITE - W2 - 22ND FLOOR SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(08)3111 - ELEPHANT TOWN CENTRE - WEST SITE - W2 - 20TH FLOOR SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(08)3110 - ELEPHANT TOWN CENTRE - WEST SITE - W2 - 18TH FLOOR SURFACE FINISH PLAN04/11/2016
Plan - TOWN617(08)3109 - ELEPHANT TOWN CENTRE - WEST SITE - W1 - 15TH FLOOR SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(08)3108 - ELEPHANT TOWN CENTRE - WEST SITE - W2 - TOWER 2 - 12TH FLOOR SURFACES FINISHES PLAN04/11/2016
Plan - TOWN617(08)3107 - ELEPHANT TOWN CENTRE - WEST SITE - TOWER 1 - TOWER 2 - 10TH FL - SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(08)3106 - ELEPHANT TOWN CENTRE - WEST SITE W1 - TOWER 1 -7TH FLOOR SURFACES FINISHES PLAN04/11/2016
Plan - TOWN617(03)3105 - ELEPHANT TOWN CENTRE - WEST SITE W3 - BUILDING 1, 2, 3 PODIUM SURFACES FINISHES PLAN04/11/2016
Plan - TOWN617(08)3104 - ELEPHANT TOWN CENTRE - WEST SITE W2 PODIUM SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(08)3103 - ELEPHANT TOWN CENTRE - SURFACES FINISHES PLAN EAST SITE E2 PODIUM04/11/2016
Plan - TOWN617(08)3102 - ELEPHANT TOWN CENTRE - EAST SITE E3 PODIUM SURFACES FINISHES PLAN04/11/2016
Plan - TOWN617(03)3003 - ELEPHANT TOWN CENTRE - WEST SITE GROUND LEVEL SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(03)3002 - ELEPHANT TOWN CENTRE - EAST SITE GROUND LEVEL SURFACE FINISHES PLAN04/11/2016
Plan - TOWN617(03)3001 - ELEPHANT TOWN CENTRE KEY PLAN04/11/2016
Plan - 935_02_SK_141 REV P1 - WEST SITE - DETAILED FLAT LAYOUTS - SUPPLEMENTARY INFORMATION04/11/2016
Plan - 935_02_SK_140 REV P1 - WEST SITE - DETAILED FLAT LAYOUTS - SUPPLEMENTARY INFORMATION04/11/2016
Plan - 935_02_SK_139 REV P1 - WEST SITE - DETAILED FLAT LAYOUTS - SUPPLEMENTARY INFORMATION04/11/2016
Plan - 935_02_SK_138 REV P1 - WEST SITE - DETAILED FLAT LAYOUTS - SUPPLEMENTARY INFORMATION04/11/2016
Plan - 935_01_SK_094 REV P1 - EAST SITE - DETAILED FLAT LAYOUTS - SUPPLEMENTARY INFORMATION04/11/2016
Plan - 935_01_SK_093 REV P1 - EAST SITE - DETAILED FLAT LAYOUTS - SUPPLEMENTARY INFORMATION04/11/2016
Plan - 935_02_07_312 REV P1 - WEST SITE - SECTION EE04/11/2016
Plan - 935_02_07_311 REV P1 - WEST SITE - SECTION BB04/11/2016
Plan - 935_02_07_310 REV P1 - WEST SITE - SECTION FF04/11/2016
Plan - 935_02_07_216 REV P1 - WEST SITE - OSWIN LINK - NORTH AND SOUTH04/11/2016
Plan - 935_02_07_215 REV P1 - WEST SITE - PASTOR ST - EAST ELEVATION04/11/2016
Plan - 935_02_07_214 REV P1 - WEST SITE - PASTOR ST - WEST ELEVATION04/11/2016
Plan - 935_02_07_213 REV P1 - WEST SITE - OSWIN ST - WEST ELEVATION04/11/2016
Plan - 935_02_07_212 REV P1 - WEST SITE - SOUTH ELEVATION04/11/2016
Plan - 935_02_07_211 REV P1 - WEST SITE - ST GEORGE'S ROAD ELEVATION04/11/2016
Plan - 935_02_07_210 REV P1 - WEST SITE - NEWINGTON BUTTS ELEVATION04/11/2016
Plan - 935_02_07_135 REV P1 - WEST SITE - ROOF PLAN04/11/2016
Plan - 935_02_07_134 REV P1 - WEST SITE - THIRTY-FOURTH FLOOR (PLANT)04/11/2016
Plan - 935_02_07_128 REV P1 - WEST SITE - TWENTY-EIGHTH TO THIRTY-THIRD FLOOR04/11/2016
Plan - 935_02_07_127 REV P1 - WEST SITE - TWENTY-SEVENTH FLOOR04/11/2016
Plan - 935_02_07_125 REV P1 - WEST SITE - TWENTY-FIFTH & TWENTY-SIXTH FLOOR04/11/2016
Plan - 935_02_07_123 REV P1 - WEST SITE - TWENTY-THIRD & TWENTY-FOURTH FLOOR04/11/2016
Plan - 935_02_07_122 REV P1 - WEST SITE - TWENTY-SECOND FLOOR04/11/2016
Plan - 935_02_07_120 REV P1 - WEST SITE - TWENTIETH & TWENTY-FIRST FLOOR04/11/2016
Plan - 935_02_07_119 REV P1 - WEST SITE - NINETEENTH FLOOR04/11/2016
Plan - 935_02_07_118 REV P1 - WEST SITE - EIGHTEENTH FLOOR04/11/2016
Plan - 935_02_07_117 REV P1 - WEST SITE - SEVENTEENTH FLOOR04/11/2016
Plan - 935_02_07_116 REV P1 - WEST SITE - SIXTEENTH FLOOR04/11/2016
Plan - 935_02_07_115 REV P1 - WEST SITE - FIFTHTEENTH FLOOR04/11/2016
Plan - 935_02_07_112 REV P1 - WEST SITE - TWELFTH TO FOURTEENTH FLOOR PLAN04/11/2016
Plan - 935_02_07_110 REV P1 - WEST SITE - TENTH AND ELEVENTH FLOOR PLAN04/11/2016
Plan - 935_02_07_108 REV P1 - WEST SITE - EIGHTH AND NINTH FLOOR PLAN04/11/2016
Plan - 935_02_07_107 REV P1 - WEST SITE - SEVENTH FLOOR PLAN04/11/2016
Plan - 935_02_07_106 REV P1 - WEST SITE - SIXTH FLOOR PLAN04/11/2016
Plan - 935_02_07_105 REV P1 - WEST SITE - FIFTH FLOOR PLAN04/11/2016
Plan - 935_02_07_104 REV P1 - WEST SITE - FOURTH FLOOR PLAN04/11/2016
Plan - 935_02_07_103 REV P1 - WEST SITE - THIRD FLOOR PLAN04/11/2016
Plan - 935_02_07_102 REV P1 - WEST SITE - SECOND FLOOR PLAN04/11/2016
Plan - 935_02_07_101 REV P1 - WEST SITE - FIRST FLOOR PLAN04/11/2016
Plan - 935_02_07_100UG - WEST SITE - UPPER GROUND FLOOR PLAN04/11/2016
Plan - 935_02_07_100 REV P1 - WEST SITE - GROUND FLOOR PLAN04/11/2016
Plan - 935_02_07_099 REV P1 - WEST SITE - BASEMENT PLAN04/11/2016
Plan - 935_02_07_020 REV P1 - WEST SITE - NEWINGTON BUTTS ELEVATION04/11/2016
Plan - 935_01_07_509 REV P1 - BRIDGE STUDY04/11/2016
Plan - existing - 935_02_07_060 REV P1 - EXISTING WEST SITE - NORTH ELEVATION04/11/2016
Plan - existing - 935_01_07_061 REV P1 - EXISTING EAST SITE - EAST ELEVATION03/11/2016
Plan - existing - 935_01_07_062 REV P1 - EXISTING EAST SITE - SOUTH ELEVATION03/11/2016
Plan - existing - 935_01_SK_107 - EXISTING EAST SITE - S0UTH EAST ARCHES15/08/2017
Plan - existing - 935_01_SK_107 - EAST SITE: SOUTH EAST ARCHES - EXISTING02/08/2017
Plan - existing - 935_02_07_063 REV P1 - EXISTING WEST SITE - WEST AND SOUTH ELEVATIONS04/11/2016
Plan - existing - 935_02_07_062 REV P1 - EXISTING WEST SITE - SOUTH AND WEST ELEVATIONS04/11/2016
Plan - existing - 935_02_07_061 REV P1 - EXISTING WEST SITE - EAST ELEVATION04/11/2016
Plan - existing - 935_02_07_050 REV P1 - EXISTING WEST SITE - ROOF PLAN - DEMOLITION04/11/2016
Plan - existing - 935_01_07_064 REV P1 - EXISTING EAST SITE - CORONET ELEVATIONS03/11/2016
Plan - existing - 935_01_07_063 REV P1 - EXISTING EAST SITE - WEST ELEVATION03/11/2016
Plan - proposed - 935_01_SK_108 - EAST SITE: SOUTH EAST ARCHES - PROPOSED02/08/2017
Plan - proposed - 935_01_SK_108 - PROPOSED EAST SITE - SOUTH EAST ARCHES15/08/2017
Planning statement03/11/2016
Site Notice27/07/2017
Site Notice27/02/2017
Statutory consultee replies - LONDON UNDERGROUND16/03/2018
Statutory consultee replies - WESTMINSTER CITY COUNCIL16/03/2018
Statutory consultee replies - CITY OF LONDON15/03/2018
Statutory consultee replies - TFL letter tube station upgrade26/02/2018
Statutory consultee replies - METROPOLITAN POLICE15/06/2018
Statutory consultee replies - ENVIRONMENT AGENCY22/03/2018
Statutory consultee replies - THAMES WATER23/03/2018
Statutory consultee replies - HEALTH AND SAFETY EXECUTIVE12/03/2018
Sustainability statement03/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 2 (APPENDIX T)13/03/2018
Transport statement03/11/2016
Transport statement - Transport Assessment addendum part 431/08/2017
Transport statement - Transport Assessment addendum part 331/08/2017
Transport statement - Transport Assessment addendum part 231/08/2017
Transport statement - Transport Assessment addendum part 131/08/2017
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 21 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 20 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 19 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 18 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 17 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 16 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 15 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 14 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 13 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 12 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 11 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 10 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 9 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 8 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 7 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 6 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 4 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 3 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 5 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 2 OF 2103/11/2016
Transport statement - APPENDICES AND FIGURES - VOLUME 1 - PART 1 OF 2103/11/2016
Transport statement - UPDATED TRANSPORT NOTE FEBRUARY 201813/02/2018
Viability Report - Development Appraisal (with grant funding) dated 22nd June 201826/06/2018
Viability Report - FINANCIAL VIABILITY ASSESSMENT - EXECUTIVE SUMMARY15/11/2016
Viability Report - LETTER DATED 13TH APRIL 2018 FROM GVA21/06/2018
Viability Report - FINANCIAL VIABILITY ASSESSMENT - EXECUTIVE SUMMARY UPDATE21/06/2018
Viability Report - FINANCIAL VIABILITY ASSESSMENT - ADDENDUM21/06/2018
Viability Report - AFFORDABLE HOUSING VIABILITY REVIEW - JUNE 201821/06/2018
Viability Report - BUILD TO RENT SCHEME - 35% AH - PROVISION OF 116 SOCIAL RENT21/06/2018
Viability Report - LETTER DATED 13TH APRIL 2018 FROM GVA21/06/2018
Viability Report - FINANCIAL VIABILITY ASSESSMENT - EXECUTIVE SUMMARY UPDATE21/06/2018
Viability Report - LETTER FROM DP9 DATED 5TH FEBRUARY 201821/06/2018
Viability Report - LETTER DATED 13TH FEBRUARY 2018 FROM DP921/06/2018
Viability Report - BUILD TO RENT SCHEME21/06/2018
Viability Report - PART OMS/PART BIR SCHEME21/06/2018
Viability Report - BUILD TO RENT SCHEME21/06/2018
Viability Report - AFFORDABLE HOUSING VIABILITY REVIEW21/06/2018
Viability Report - REVISED EXECUTIVE SUMMARY FEBRUARY 201813/02/2018
Viability Report - Applicant's revised financial viability appraisal07/12/2017
Viability Report - Revised financial viablity executive summary07/12/2017
Viability Report - Revised viablity review on behalf of LPA07/12/2017
Viability Report - Viability review on behalf of LPA07/12/2017
Viability Report - FINANCIAL VIABILITY ASSESSMENT - NOVEMBER 201621/06/2018

 

Contact us

Southwark Council
PO BOX 64529
London SE1P 5LX

020 7525 5000

csc@southwark.gov.uk

More contacts...

Follow us What is this?