Affordable housing statement - REVISED AFFORDABLE HOUSING STATEMENT07/04/2016
Amended plan - ADPA-505 - UPPER LEVEL - TYPE 5 - FACADE DETAILS18/03/2016
Amended plan - ADPA-001 - LOCATION PLAN18/03/2016
Amended plan - ADPA-002 - SITE PLAN18/03/2016
Amended plan - ADPA-003 - EXISTING SITE PLAN18/03/2016
Amended plan - ADPA-504 - MID LEVEL - TYPE 4 - FACADE DETAILS18/03/2016
Amended plan - ADPA-503 - MID LEVEL - TYPE 3 - FACADE DETAILS18/03/2016
Amended plan - ADPA-502 - GROUND LEVEL - TYPE 2 - FACADE DETAILS18/03/2016
Amended plan - ADPA-501 - GROUND LEVEL - TYPE 1 - FACADE DETAILS18/03/2016
Amended plan - ADPA-301 - CATEGORY 3 - WHEELCHAIR USER DWELLINGS18/03/2016
Amended plan - ADPA-253 - SITE CROSS SECTIONS18/03/2016
Amended plan - ADPA-252 - WEST INTERNAL ELEVATION - SITE LONGTUDINAL SECTION18/03/2016
Amended plan - ADPA-251 - EAST INTERNAL ELEVATION - SITE LONGITUDINAL SECTION18/03/2016
Amended plan - ADPA-204 - BUILDING ELEVATION - WEST ELEVATION18/03/2016
Amended plan - ADPA-203 - BUILDING ELEVATIONS - SOUTH ELEVATION18/03/2016
Amended plan - ADPA-202 - BUILDING ELEVATIONS - EAST ELEVATION18/03/2016
Amended plan - ADPA-201 - BUILDING ELEVATIONS - NORTH ELEVATION18/03/2016
Amended plan - ADPA-122 - ROOF PLAN18/03/2016
Amended plan - ADPA-121 - BUILDING B - LEVELS 21-2518/03/2016
Amended plan - ADPA-120 - BUILDING B - LEVELS 19-20 PLAN18/03/2016
Amended plan - ADPA-119 - BUILDING B - LEVELS 16-18 PLAN18/03/2016
Amended plan - ADPA-118 - BUILDING B - LEVELS 14-15 PLAN18/03/2016
Amended plan - ADPA-117 - BUILDING B - LEVELS 08-13 PLAN18/03/2016
Amended plan - ADPA-116 - BUILDING A - LEVELS 35-39 PLAN18/03/2016
Amended plan - ADPA-115 - BUILDING A - LEVELS 27-35 PLANS18/03/2016
Amended plan - ADPA-114 - BUILDING A - LEVELS 20-26 PLAN18/03/2016
Amended plan - ADPA-113 - BUILDING A - LEVELS 09-19 PLAN18/03/2016
Amended plan - ADPA-112 - BUILDING A - LEVEL 13 AND BUILDING B&C - LEVEL 12 PLAN18/03/2016
Amended plan - ADPA-111 - LEVEL 11 PLAN - TYPICAL UPPER OFFICE AND LOWER RESIDENTIAL LEVEL18/03/2016
Amended plan - ADPA-110 - LEVEL 08 PLAN - TERRACE18/03/2016
Amended plan - ADPA-109 - LEVEL 05 PLAN - TYPICAL MID OFFICE LEVEL18/03/2016
Amended plan - ADPA-108 - LEVEL 04 PLAN18/03/2016
Amended plan - ADPA-107 - LEVEL 03 PLAN18/03/2016
Amended plan - ADPA-106 - LEVEL 01 PLAN - TYPICAL LOWER OFFICE LEVEL18/03/2016
Amended plan - ADPA-105A - GROUND LEVEL MEZZANINE18/03/2016
Amended plan - ADPA-105 - GROUND LEVEL PLAN18/03/2016
Amended plan - ADPA-104 - BASEMENT LEVEL B1 MEZZANINE PLAN18/03/2016
Amended plan - ADPA-103 - BASEMENT LEVEL B1 PLAN18/03/2016
Amended plan - ADPA-012 - EXISTING FLOOR PLANS - PERRY LIBRARY AND KEYWORTH STREET HOSTEL18/03/2016
Amended plan - ADPA-011 - EXISTING FLOOR PLANS18/03/2016
Application form25/01/2016
Application: Covering letter01/07/2016
Application: Covering letter18/03/2016
Application: Covering letter25/01/2016
Community Infrastructure Levy (CIL) Notices - COMMUNITY INFRASTRUCTURE LEVY (CIL) FORM 1 - ASSUMPTION OF LIABILITY25/01/2016
Community Infrastructure Levy (CIL) general - CIL INFO FORM 18Dec1525/01/2016
Consultation List28/01/2016
Daylight/Sunlight assessment - INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT - PART 1 OF 325/01/2016
Daylight/Sunlight assessment - INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT - PART 3 OF 325/01/2016
Daylight/Sunlight assessment - INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT - PART 2 OF 325/01/2016
Daylight/Sunlight assessment - REVISED INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT - PART 2 OF 218/03/2016
Daylight/Sunlight assessment - REVISED INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT - PART 1 OF 218/03/2016
Decision notice02/07/2018
Design and access statement - REVISED DESIGN AND ACCESS STATEMENT - PART 1 OF 618/03/2016
Design and access statement - ACCESS STATEMENT - PART 2 OF 218/03/2016
Design and access statement - CHAPTER 10 - APPENDIX25/01/2016
Design and access statement - CHAPTER 9 - CONCLUSION25/01/2016
Design and access statement - CHAPTER 8 - ACCESSIBILITY25/01/2016
Design and access statement - CHAPTER 7 - TECHNICAL PERFORMANCE25/01/2016
Design and access statement - CHAPTER 6 - VIEWS25/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 8 OF 825/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 7 OF 825/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 6 OF 825/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 5 OF 825/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 4 OF 825/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 3 OF 825/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 2 OF 825/01/2016
Design and access statement - CHAPTER 5 - PUBLIC REALM - PART 1 OF 825/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 12 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 11 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 9 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 8 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 7 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 6 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 5 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 4 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 3 OF 1225/01/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 1 OF 1225/01/2016
Design and access statement - CHAPTER 3 - DESIGN PRINCIPLES - PART 5 OF 525/01/2016
Design and access statement - CHAPTER 3 - DESIGN PRINCIPLES - PART 4 OF 525/01/2016
Design and access statement - CHAPTER 3 - DESIGN PRINCIPLES - PART 3 OF 525/01/2016
Design and access statement - CHAPTER 3 - DESIGN PRINCIPLES - PART 2 OF 525/01/2016
Design and access statement - CHAPTER 3 - DESIGN PRINCIPLES - PART 1 OF 525/01/2016
Design and access statement - CHAPTER 2 - DESIGN CONTEXT25/01/2016
Design and access statement - CHAPTER 1 - INTRODUCTION25/01/2016
Design and access statement - ACCESS STATEMENT - PART 9 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 8 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 7 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 6 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 5 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 4 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 3 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 2 OF 925/01/2016
Design and access statement - ACCESS STATEMENT - PART 1 OF 925/01/2016
Design and access statement - REVISED DESIGN AND ACCESS STATEMENT - PART 2 OF 618/03/2016
Design and access statement - REVISED DESIGN AND ACCESS STATEMENT - PART 3 OF 618/03/2016
Design and access statement - REVISED DESIGN AND ACCESS STATEMENT - PART 4 OF 618/03/2016
Design and access statement - REVISED DESIGN AND ACCESS STATEMENT - PART 5 OF 618/03/2016
Design and access statement - REVISED DESIGN AND ACCESS STATEMENT - PART 6 OF 618/03/2016
Design and access statement - ACCESS STATEMENT - PART 1 OF 218/03/2016
Design and access statement - CHAPTER 4 - ARCHITECTURAL DESIGN - PART 10 OF 1225/01/2016
Directions - GLA REFERRAL 319/12/2016
Directions - GLA REFERRAL 119/12/2016
Directions - GLA REFERRAL 219/12/2016
Directions - GLA LETTER 03/03/201608/03/2016
Document - MET POLICE REQUIREMENT FOR ADDTIONAL FLOOR SPACE10/08/2016
Document - FINANCIAL VIABILITY ASSESSMENT COVERING LETTER13/06/2016
Document - DRP 2 REPORT16/11/2015
Document - FINANCIAL VIABILITY ASSESSMENT REV 1 - MARCH 201601/07/2016
Document - FINANCIAL VIABILITY ASSESSMENT - DECEMBER 201501/07/2016
Document - DRP REPORT06/07/2015
Document - REVISED ENVIRONMENTAL STATEMENT - NON TECHICAL SUMMARY - PART 3 OF 318/03/2016
Document - REVISED ENVIRONMENTAL STATEMENT - NON TECHICAL SUMMARY - PART 2 OF 318/03/2016
Document - REVISED ENVIRONMENTAL STATEMENT - NON TECHICAL SUMMARY - PART 1 OF 318/03/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 3 - UPDATED TRANSPORT ASSESSMENT - APPENDICES - PART 2 OF 218/03/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 3 - UPDATED TRANSPORT ASSESSMENT - APPENDICES - PART 1 OF 218/03/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 3 - UPDATED TRANSPORT ASSESSMENT18/03/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - TOWNSCAPES, BUILT HERITAGE AND VISUAL IMPACT - ADDENDUM18/03/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT ADDENDUM - PART 2 OF 218/03/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT ADDENDUM - PART 1 OF 218/03/2016
Document - REVISED DRAFT SECTION 106 HEADS OF TERMS18/03/2016
Document - REVISED CULTURAL STATEMENT18/03/2016
Document - REVISED CIL FORM18/03/2016
Document - DRAWING SCHEDULE27/01/2016
Document - ENVIRONMENTAL STATEMENT - NON TECHNICAL SUMMARY26/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 25 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 24 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 23 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 22 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 21 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 20 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 19 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 18 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 17 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 16 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 15 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 13 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 12 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 14 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 11 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 10 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 9 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 8 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 7 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 6 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 5 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 4 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 3 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 2 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - APPENDICES - PART 1 OF 2526/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 6 OF 6 - TOWNSCAPES, BUILT HERITAGE AND VISUAL IMPACT ADDENDUM26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 5 OF 6 - TOWNSCAPES, BUILT HERITAGE AND VISUAL IMPACT ADDENDUM26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 3 OF 6 - TOWNSCAPES, BUILT HERITAGE AND VISUAL IMPACT ADDENDUM26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 2 OF 6 - TOWNSCAPES, BUILT HERITAGE AND VISUAL IMPACT ADDENDUM26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 1 OF 6 - TOWNSCAPES, BUILT HERITAGE AND VISUAL IMPACT ADDENDUM26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 4 OF 6 - TOWNSCAPES, BUILT HERITAGE AND VISUAL IMPACT ADDENDUM26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 39 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 38 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 37 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 36 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 35 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 34 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 33 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 32 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 31 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 30 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 29 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 28 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 27 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 26 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 25 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 24 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 23 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 22 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 21 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 20 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT26/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 19 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 18 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 17 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 16 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 15 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 13 OF39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 12 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 11 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 14 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 10 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 9 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 8 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 7 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 6 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 5 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 4 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 3 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 2 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 2 - PART 1 OF 39 - TOWNSCAPE, BUILT HERITAGE AND VISUAL IMPACT ASSESSMENT25/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 19 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 18 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 17 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 16 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 15 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 14 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 13 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 12 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 11 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 10 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 9 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 8 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 7 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 6 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 5 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 4 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 3 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 2 OF 1925/01/2016
Document - ENVIRONMENTAL STATEMENT - VOLUME 1 - MAIN TEXT - PART 1 OF 1925/01/2016
Document - ACCOMMODATION SCHEDULE25/01/2016
Document - DRAFT SECTION 106 HEADS OF TERMS25/01/2016
Document - EQUALITIES IMPACT ASSESSMENT25/01/2016
Document - CULTURAL STATEMENT25/01/2016
Document - AFFORDABLE HOUSING STATEMENT25/01/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 2 OF 225/01/2016
Document - STATEMENT OF COMMUNITY INVOLVEMENT - PART 1 OF 225/01/2016
Document - NOTICE UNDER ARTICLE 13 - LETTER 225/01/2016
Document - NOTICE UNDER ARTICLE 13 - LETTER 125/01/2016
Energy statement - REVISED ENERGY STATEMENT - PART 5 OF 518/03/2016
Energy statement - APPENDICES - APPENDIX A - COMMERCIAL BUILDING FABRIC AND SYSTEM PERFORMANCE SUMMARY26/01/2016
Energy statement - REVISED ENERGY STATEMENT - PART 3 OF 518/03/2016
Energy statement - REVISED ENERGY STATEMENT - PART 2 OF 518/03/2016
Energy statement - REVISED ENERGY STATEMENT - PART 1 OF 518/03/2016
Energy statement - APPENDICES - APPENDIX K - APPRAISAL OF GROUND SOURCE COOLING SYSTEM26/01/2016
Energy statement - APPENDICES - APPENDIX J - OVERHEATING ANALYSIS26/01/2016
Energy statement - APPENDICES - APPENDIX I - PART 2 OF 2 - BRUKL OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX I - PART 1 OF 2 - BRUKL OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 34 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 33 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 32 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 31 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 30 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 29 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 28 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 27 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 26 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 25 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 24 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 23 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 22 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 21 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 20 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 19 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 18 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 17 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 16 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 15 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 14 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 13 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 12 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 11 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 10 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 9 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 8 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 7 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 6 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 5 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 4 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 3 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 2 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX H - PART 1 OF 34 - SAP SUMMARY OUTPUT SHEET26/01/2016
Energy statement - APPENDICES - APPENDIX G - VIABILITY OF RENEWABLE TECHNOLOGIES26/01/2016
Energy statement - APPENDICES - APPENDIX F - RESIDENTIAL FABRIC AND SYUSTEM PERFORMANCE SUMMARY26/01/2016
Energy statement - APPENDICES - APPENDIX E - BUILDING CO2 EMISSIONS/ENERGY CONSUMPTION - RESIDENTIAL26/01/2016
Energy statement - APPENDICES - APPENDIX D - BUILDING CO2 EMISSIONS/ENERGY CONSUMPTION - CULTURAL AND LEISURE CENTRE26/01/2016
Energy statement - APPENDICES - APPENDIX C - BUILDING CO2 EMISSIONS/ENERGY CONSUMPTION - RETAIL26/01/2016
Energy statement - APPENDICES - APPENDIX B - BUILDING CO2 EMISSIONS/ENERGY CONSUMPTION - OFFICES26/01/2016
Energy statement - PART 2 OF 226/01/2016
Energy statement - PART 1 OF 226/01/2016
Energy statement - REVISED ENERGY STATEMENT - PART 4 OF 518/03/2016
Landscaping and open space statement - ADDENDUM - PART 2 OF 218/03/2016
Landscaping and open space statement - CHAPTER 1 - INTRODUCTION26/01/2016
Landscaping and open space statement - CHAPTER 6 - PART 3 OF 3 - APPENDICES27/01/2016
Landscaping and open space statement - CHAPTER 6 - PART 2 OF 3 - APPENDICES27/01/2016
Landscaping and open space statement - CHAPTER 6 - PART 1 OF 3 - APPENDICES27/01/2016
Landscaping and open space statement - CHAPTER 5 - CONCLUSION27/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 8 OF 8 - LANDSCAPE DESIGN27/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 7 OF 8 - LANDSCAPE DESIGN27/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 6 OF 8 - LANDSCAPE DESIGN27/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 5 OF 8 - LANDSCAPE DESIGN27/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 4 OF 8 - LANDSCAPE DESIGN27/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 3 OF 8 - LANDSCAPE DESIGN26/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 2 OF 8 - LANDSCAPE DESIGN26/01/2016
Landscaping and open space statement - CHAPTER 4 - PART 1 OF 8 - LANDSCAPE DESIGN26/01/2016
Landscaping and open space statement - CHAPTER 3 - DESIGN DEVELOPMENT26/01/2016
Landscaping and open space statement - CHAPTER 2 - EXISTING SITE26/01/2016
Landscaping and open space statement - ADDENDUM - PART 1 OF 218/03/2016
Plan - DPA-121 REV 2 - ROOM SIZES - BUILDING B - LEVELS 21 - 2527/01/2016
Plan - DPA-120 REV 2 - ROOM SIZES - BUILDING B - LEVELS 19 - 20 PLAN27/01/2016
Plan - DPA-001 REV 1 - LOCATION PLAN27/01/2016
Plan - DPA-002 REV 1 - SITE PLAN27/01/2016
Plan - DPA-101 REV 1 - BASEMENT LEVEL B2 PLAN27/01/2016
Plan - DPA-119 REV 2 - ROOM SIZES - BUILDING B - LEVELS 16 - 18 PLAN27/01/2016
Plan - DPA-118 REV 2 - ROOM SIZES - BUILDING B - LEVELS 14 - 15 PLAN27/01/2016
Plan - DPA-117 REV 2 - ROOM SIZES - BUILDING B - LEVELS 08 - 13 PLAN27/01/2016
Plan - DPA-116 REV 2 - ROOM SIZES - BUILDING A - LEVELS 36 - 39 PLAN27/01/2016
Plan - DPA-115 REV 2 - ROOM SIZES - BUILDING A - LEVELS 27 - 35 PLANS27/01/2016
Plan - DPA-114 REV 2 - ROOM SIZES - BUILDING A - LEVELS 20 - 26 PLAN27/01/2016
Plan - DPA-113 REV 2 - ROOM SIZES - BUILDING A - LEVELS 08 - 19 PLAN27/01/2016
Plan - DPA-112 REV 2 - ROOM SIZES - BUILDING A - LEVEL 13 - BUILDING B&C LEVEL 12 PLAN27/01/2016
Plan - DPA-110 REV 2 - ROOM SIZES - LEVEL 07 PLAN - TERRACE27/01/2016
Plan - DPA-505 - UPPER LEVEL - TYPE 5 - FACADE DETAILS27/01/2016
Plan - DPA-504 REV 1 - MID LEVEL - TYPE 4 - FACADE DETAILS27/01/2016
Plan - DPA-111 REV 2 - ROOM SIZES - LEVEL 11 PLAN - TYPICAL UPPER OFFICE AND LOWER RESIDENTIAL LEVEL27/01/2016
Plan - DPA-503 REV 1 - MID LEVEL - TYPE 3 - FACADE DETAILS27/01/2016
Plan - DPA-502 REV 1 - GROUND LEVEL - TYPE 2 - FACADE DETAILS27/01/2016
Plan - DPA-501 REV 1 - GROUND LEVEL - TYPE 1 - FACADE DETAILS27/01/2016
Plan - DPA-301 REV 1 - CATEGORY 3 - WHEELCHAIR USER DWELLINGS27/01/2016
Plan - DPA-253 REV 1 - SITE CROSS SECTIONS27/01/2016
Plan - DPA-252 REV 1 - WEST INTERNAL ELEVATION - SITE LOGITUDINAL SECTION27/01/2016
Plan - DPA-251 REV 1 - EAST INTERNAL ELEVATION - SITE LONGITUDINAL SECTION27/01/2016
Plan - DPA-204 REV 1 - BUILDING ELEVATION - WEST ELEVATION27/01/2016
Plan - DPA-203 REV 1 - BUILDING ELEVATIONS - SOUTH ELEVATION27/01/2016
Plan - DPA-202 REV 1 - BUILDING ELEVATIONS - EAST ELEVATION27/01/2016
Plan - DPA-201 REV 1 - BUILDING ELEVATIONS - NORTH ELEVATION27/01/2016
Plan - DPA-122 REV 1 - ROOF PLAN27/01/2016
Plan - DPA-121 REV 1 - BUILDING B - LEVELS 21 - 2527/01/2016
Plan - DPA-120 REV 1 - BUILDING B - LEVELS 19 - 20 PLAN27/01/2016
Plan - DPA-119 REV 1 - BUILDING B - LEVELS 16 - 18 PLAN27/01/2016
Plan - DPA-118 REV 1 - BUILDING B - LEVELS 14 - 15 PLAN27/01/2016
Plan - DPA-117 REV 1 - BUILDING B - LEVELS 08 - 13 PLAN27/01/2016
Plan - DPA-116 REV 1 - BUILDING A - LEVELS 36 - 39 PLAN27/01/2016
Plan - DPA-115 REV 1 - BUILDING A - LEVELS 27 - 35 PLANS27/01/2016
Plan - DPA-114 REV 1 - BUILDING A - LEVELS 20 - 28 PLAN27/01/2016
Plan - DPA-113 REV 1 - BUILDING A - LEVELS 08 - 19 PLAN27/01/2016
Plan - DPA-112 REV 1 - BUILDING A - LEVEL 13 - BUILDING B&C - LEVEL 12 PLAN27/01/2016
Plan - DPA-111 REV 1 - LEVEL 11 PLAN - TYPICAL UPPER OFFICE AND LOWER RESIDENTIAL LEVEL27/01/2016
Plan - DPA-110 REV 1 - LEVEL 07 PLAN - TERRACE27/01/2016
Plan - DPA-109 REV 1 - LEVEL 05 PLAN - TYPICAL MID OFFICE LEVEL27/01/2016
Plan - DPA-108 REV 1 - LEVEL 04 PLAN27/01/2016
Plan - DPA-107 REV 1 - LEVEL 03 PLAN27/01/2016
Plan - DPA-106 REV 1 - LEVEL 01 PLAN - TYPICAL LOWER OFFICE LEVEL27/01/2016
Plan - DPA-105 REV 1 - GROUND LEVEL PLAN27/01/2016
Plan - DPA-104 REV 1 - BASEMENT LEVEL B1 MEZZANINE PLAN27/01/2016
Plan - DPA-103 REV 1 - BASEMENT LEVEL B1 PLAN27/01/2016
Plan - DPA-102 REV 1 - BASEMENT LEVEL B2 - MEZZANINE PLAN27/01/2016
Plan - existing - DPA-012 REV 1 - EXISTING FLOOR PLANS - PERRY LIBRARY AND KEYWORTH STREET HOTEL27/01/2016
Plan - existing - DPA-011 REV 1 - EXISTING FLOOR PLANS27/01/2016
Planning statement - ADDENDUM07/04/2016
Planning statement27/01/2016
Site location plan - DPA-003 REV 1 - EXISTING SITE PLAN27/01/2016
Statutory consultee replies - GLA STAGE 2 RESPONSE13/12/2016
Statutory consultee replies - NETWORK RAIL08/02/2016
Statutory consultee replies - ENVIRONMENT AGENCY25/02/2016
Statutory consultee replies - TWENTIETH CENTURY SOCIETY29/02/2016
Statutory consultee replies - THE ROYAL PARKS29/06/2016
Statutory consultee replies - LONDON FIRE AND EMERGENCY PLANNING AUTHORITY11/11/2016
Statutory consultee replies - THE THEATRES TRUST10/02/2016
Statutory consultee replies - HISTORIC ENGLAND12/02/2016
Statutory consultee replies - THAMES WATER19/02/2016
Statutory consultee replies - TFL19/02/2016
Statutory consultee replies - ENVIRONMENTAL AGENCY28/04/2016
Statutory consultee replies - DCLG - DECISION LETTER 17010404/01/2017
Statutory consultee replies - NATURAL ENGLAND - RECEIVED 11/02/201616/02/2016
Statutory consultee replies - LB LAMBETH04/02/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 10 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 9 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE-ASSESSMENT - PART 6 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 5 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 4 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 3 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 2 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 7 OF 1027/01/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 8 OF 1027/01/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 1 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 2 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 3 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINTABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 4 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 5 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 6 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 7 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 8 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 9 OF 1318/03/2016
Sustainability statement - INCLUDING BREEAM PRE ASSESSMENT - PART 1 OF 1027/01/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 11 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 12 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 13 OF 1318/03/2016
Sustainability statement - REVISED SUSTAINABILITY STATEMENT INCLUDING BREEAM PRE ASSESSMENT - PART 10 OF 1318/03/2016
Transport statement - PART 5 OF 527/01/2016
Transport statement - PART 4 OF 527/01/2016
Transport statement - PART 3 OF 527/01/2016
Transport statement - PART 2 OF 527/01/2016
Transport statement - PART 1 OF 527/01/2016
Travel plan27/01/2016
Viability Report - FINANCIAL VIABILITY ASSESSMENT13/06/2016